Topic | Recent |
---|---|
IAQp1 Compliance Method for Naturally Ventilated Rooms/Buildings in EuropeEBOM-v4 EQp1: Minimum indoor air quality performanceposted by Chenlu Li on Feb 16, 2023, 4:43 am
Hi, We are currently working on few new and existing buildings in Ireland. These buildings have either natural ventilation or mixed ventilation (natural vent + mechanical vent) ... Last reply: Chenlu Li, Jul 1, 2024, 7:53 am |
|
Fresh Air RequirementEBOM-v4.1 EQp1: Minimum Indoor Air Qualityposted by Pulak Goyal on Nov 28, 2023, 4:10 am
I have an existing self storage warehouse to be certified under LEED v4.1 O+M Existing Buildings. It has no regular occupants and no regularly occupied spaces. Usually the storage spaces... Last reply: Catarina Costa Goncalves, Jul 1, 2024, 7:40 am |
|
Is drywall considered a demountable feature?CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Andrea Tayah Esperão Malta de Campos on Jun 28, 2024, 11:39 am
I am working on a project for a commercial interior planning under ID+C certification that opted mainly for an open space plan but in certains areas there are some drywalls to convey privacy and... |
|
Kitchen Equipment- threshold for 1pt creditSchools-NC-v4.1 WEp2: Indoor water use reductionposted by Jeremy Theodore on Jun 28, 2024, 2:06 pm
We have a school in design achieving 40% to 45% reduction thus 4 to 5 points for Indoor Water Use Reduction per the LEED v4.1 guide. If it achieves at least 40% (antiicpated) it would then... |
|
Exemplary Performance for CSCS-v4.1 EAc5: Renewable energyposted by Sofia Barahona on Jun 27, 2024, 1:40 pm
What it the percentage of... Last reply: Sofia Barahona, Jun 28, 2024, 1:51 pm |
|
Cancel Submit for ReviewLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Nathan Lee on Jan 16, 2013, 9:16 pm
Our project has hit a bit of a wall and need some guidance on updating credit forms after submitting for review. The project is going for a split review and we prepared all the design... Last reply: Nivedietha RajKumar, Jun 28, 2024, 11:29 am |
|
Building Product Disclosure and Optimization required documentationNC-v4.1 MRc4: Material Ingredientsposted by Marcelo Alencar Pereira on Jun 25, 2024, 2:28 pm
Do I need to submit the purchase invoice or any other documentation confirming product acquisition when applying for Building Product Disclosure and Optimization credits on LEED Online? If we don... Last reply: Tommy Linstroth, Jun 28, 2024, 9:48 am |
|
Option 2 IAQ TestingNC-v4 EQc4: Indoor air quality assessmentposted by Robert Cashins on Nov 7, 2022, 12:18 pm
Are there guidelines on how to determine how many air samples need to be collected to comply with the... Last reply: Bipin Karki, Jun 26, 2024, 4:49 pm |
|
Are all spaces outside the 3x head height excluded?NC-v4.1 EQc8: Quality Viewsposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 10, 2024, 9:17 am
I realize this is most likely quite a basic question, but in V4.1 are allowable quality view areas only for those regularly occupied spaces within the 3x head height zone and all others do not... Last reply: Adam McCaughan, Jun 27, 2024, 12:23 pm |
|
Pressurized entryway vestibules at high-volume building entrancesHealthcare-v4 EQc1: Enhanced indoor air quality strategiesposted by Priscillia Champagne on Feb 1, 2021, 8:26 am
Hi, I would like to know if there is additional guidance on the requirement to provide pressurized entryway vestibules at high-volume building entrances. Is there a standard to follow or specific... Last reply: Kai Starn, Jun 27, 2024, 12:19 pm |