Log in
Forum » Ireland
Topic

Green Power Five Year Contracts

NC-v4 EAc7: Green power and carbon offsets
posted by Sean Hogan on Feb 28, 2017, 7:14 am

I work for a corporate client seeking the...

Last reply: Heather Schrock, Dec 28, 2020, 11:20 am

R32 Refrigerant Not in The LEED Form

CS-v4 EAc6: Enhanced Refrigerant Management
posted by Laura Nolan on Aug 19, 2020, 1:24 pm

Hi all. In the LEED form, the R32 refrigerant is not yet on the list. How do I demonstrate the refrigerant impact outside of the form? Can someone share with me how they have overcome this issue...

Last reply: Bipin Karki, Dec 8, 2020, 8:11 am

Environmental Product Declarations Exemplary Performance

NC-v4 MRc2: Building product disclosure and optimization - environmental product declarations
posted by Shane Doyle on Jul 7, 2020, 11:44 am

Hello,

I have a question in relation to achieving exemplary performance in the Environmental Product Declarations credit in the In LEED V4 BD+C. To achieve 1 point for exemplary...

Last reply: Bipin Karki, Oct 14, 2020, 2:44 pm

LEEDv4 BD+C: Core & Shell to LEEDv4 BD+C: Warehouses and Distribution

LEED Rating System Selection
posted by Wayne Mc Fall on Aug 27, 2020, 2:15 pm

Hi All,

Is it possible for a warehouse / office project to register as LEEDv4 BD+C: Core & Shell but change the certification type to LEEDv4 BD+C: Warehouses and Distribution after...

Last reply: Ralph Bicknese, Oct 6, 2020, 4:21 pm

New Safety First Pilot Credits

Pilot-Credits INpc137: Safety First: Cleaning and Disinfecting Your Space
posted by Sam Fagan on Jul 17, 2020, 6:10 am

Brightworks Sustainability Brightworks Sustainability LLC LEEDuser Premium Member 40 thumbs up September 30, 2020- 11:28 am POST FOR INpc136:  Agreed- Also, there is not a forum for INpc136, which is needed, as noted in the Pilot Credit Survey. Log in or register to post comments ...

Last reply: Brightworks Sustainability, Sep 30, 2020, 11:28 am

Phone Booth Room Ventilation

CI-v4 EQp1: Minimum indoor air quality performance
posted by Ciaran McCabe on May 31, 2018, 9:16 am

Under LEED v4 ID & C for an Office Fit-Out;

What is the correct occupancy category from ASHRAE 62.1 Table 6-1 for an intermittently occupied phone booth room/space,...

Last reply: Chern Yue Ewe, Sep 28, 2020, 9:43 pm

Green power and carbon offsets- 100% Electric Building

CS-v4 EAc7: Green power and carbon offsets
posted by Wayne Mc Fall on Sep 13, 2020, 5:39 pm

Hi All,

We are working on a 100% electric building pursuing LEEDv4 BD+C: Core and Shell. The client would like to explore the option of pursuing the...

Last reply: Wayne Mc Fall, Sep 14, 2020, 11:53 am

Total project paving area

CS-v4 SSc5: Heat Island Reduction
posted by Shane Doyle on Aug 31, 2020, 12:56 pm

Hi,

I am just looking for some guidance please in relation to the credit upload form for the Heat Island Reduction credit.

In the form section "Summary of Heat Island Reduction...

Both Option 1 & Option 2 achievable

NC-v4 LTc3: High Priority Site and Equitable Development
posted by Muge Karasahin on Apr 25, 2018, 4:48 am

Hello,

Our project site qualifies both for Option 1. Historic District and Option 2. Priority Designation of the credit. Is it possible to claim two points for this credit?

Thank...

Last reply: Emily Purcell, May 4, 2020, 11:11 am

LEED Basement Boundary

Healthcare-v2009 MPR3: Must use a reasonable site boundary
posted by Francis McNulty on Sep 27, 2016, 11:46 am

Hi,

I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately. I am trying to define the LEED boundary in the basement to line up...

Last reply: Juven Marius Mirano, Mar 4, 2020, 5:47 am