Non default use time for lavatory faucets

NC-v4 WEc2: Indoor water use reduction
posted by Ruju Rathod on Mar 31, 2021, 4:10 pm

projects attempt to still document a non-default duration within this credit's forum pages, I don't believe I've seen any succeed. The CDC has recommended a minimum of a 20-second duration...

Last reply: Peter Downar, Jan 12, 2022, 12:46 pm

MR- material ingredients

LEED Canada Forum
posted by Kristi Merdler on Jan 11, 2022, 6:17 pm

Paula Melton Editorial Director BuildingGreen, Inc. LEEDuser Moderator 178 thumbs up January 12, 2022- 9:10 am Hi, Kristi! Not sure of the answer to your question, but I'm thinking you will have more luck getting an answer if you post it here: https://leeduser.buildinggreen.com/forums?f%5B0%5D=im_field_credits%3A5066 Log in or register to post comments ...

Last reply: Paula Melton, Jan 12, 2022, 9:10 am

Frit: Views versus Bird collision deterrence

Pilot-Credits SSpc55: Bird collision deterrence
posted by Kath Williams on Jan 11, 2022, 12:02 pm

Following design decisions, our team discovered the frit pattern chosen to deter bird collision ultimately interfered with obtaining Views credit. This should be noted as a challenge to be...

LEED V4 or LEED V4.1 for a new Project in Europe

LEED v4.1 Discussion Forum
posted by Amjad Ali H Ahmadalshteihi on Jan 11, 2022, 9:00 am

Hello there, 
We are dealing with a new Office Tower project located in Europe and the owner is aiming Platinum LEED Certificate. 
My question is, should I adapt fully the LEED V4.1...

Last reply: Zsuzsanna Gidro, Jan 11, 2022, 11:21 am

Monitoring requirement for CAV/VAV system or fan?

NC-v4 EQp1: Minimum indoor air quality performance
posted by Camilo Velez on Jan 8, 2022, 7:18 pm

Good afternoon all,

We are working on a project where we have a 100% Outdoor Air system that will operate at 100% (constant volume) under normal operating conditions, however it...

Last reply: Camilo Velez, Jan 10, 2022, 3:53 pm

Exemplary performance threshold under v4.1?

NC-v4.1 SSc4: Rainwater management
posted by Casey Cullen-Woods on Jan 28, 2020, 9:27 am

Is anyone able to locate if there is a revised threshold for exemplary performance under v4.1 of this credit? My particular project is a non zero lot line

Last reply: Lyle Axelarris, Jan 10, 2022, 2:39 pm

Rainwater Management- Exemplary Performance

NC-v4 SSc4: Rainwater management
posted by LUCY WILLIAMS on Oct 9, 2017, 3:09 pm

Per page 194 of the v4 BD+C Reference Guide, the Exemplary Performance section indicates "Manage 100% of rainwater that falls within the project boundary".  This is a fairly vague statement.  Is...

Last reply: Lyle Axelarris, Jan 10, 2022, 2:35 pm

Tool for LCA

NC-v4.1 MRc1: Building life-cycle impact reduction
posted by Martin Maribo on Jan 10, 2022, 10:07 am

Can the Danish tool, LCAbyg, for MR Credit: Building Life-Cycle Impact Reduction be used for a project in Denmark?

LCAbyg is based on EN 15978 and include modules A1, A2, A3, A4, A5, B4,...

Does the Core and Shell project also have to meet the Exhaust Rate for the Kitchen?

CS-v4 EQp1: Minimum indoor air quality performance
posted by Eric Dyer on Jan 9, 2022, 9:21 pm

Hello, I am working on a logistics warehouse project in Korea. The Rating System is v4 CS and I have a question in progress.

There is a Cafateria in our building, but due to the Core and...

Zero lot line Definition

NC-v4 SSp1: Construction Activity Pollution Prevention
posted by Alex Edwards on Dec 30, 2021, 2:42 am

Hi All!

I read the definition of zero lot line and have a question, does the basement count as construction area?
For example, my building has a basement that takes up the entire...

Last reply: Jose Gonzalez, Jan 9, 2022, 7:05 pm