Is anyone able to locate if there is a revised threshold for exemplary performance under v4.1 of this credit? My particular project is a non zero lot line
Hello Casey,
There is no mention of Exemplary Performance related to this credit in LEED V4.1 BD+C Beta Guide 1_22_19 or online reference. So, we usually refer to the LEED v4 reference guide for missing guidance in v4.1. So, I guess exemplary performance from v4.1 (Manage 100% of rainwater that falls within the project boundary) still holds.
Thanks!