Topic | Recent |
---|---|
Joint Compound and Joint Tape- GREENGUARD Gold requirementsNC-v4.1 EQc2: Low-emitting materialsposted by Jason Biondi on Jul 29, 2019, 3:08 am
Here is the technical advice we receive for one of the project: "Provide general emissions evaluation results for ProForm All Purpose Joint Compound and Joint Tape. The documentation for... Last reply: Edgar Arevalo, Jul 17, 2024, 1:50 pm |
|
Integrative Analysis of Building MaterialsPilot-Credits MRpc103: Integrative Analysis of Building Materialsposted by on Jan 5, 2023, 10:45 am
The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits. Analyzing a combination of EPDs, HPDs, and Safety Data Sheets for the products installed allowed the team... Last reply: Gabrielle Gambino Lyon, Jul 17, 2024, 12:14 pm |
|
Hard-lid ceiling with access panelNC-v4 EQc1: Enhanced indoor air quality strategiesposted by on Jul 16, 2024, 2:42 pm
For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling? Deck to deck partitions aren't feasible for the janitor's... |
|
RECs in EBOM 4.1EBOM-v4.1 EAp3: Energy Performanceposted by Christian Garcia on Apr 18, 2024, 10:50 am
I came across an old video where it is explained this version doesn't take into account the purchase of RECs but it is considered for the future. This video is from 5 years ago. Does anyone know... Last reply: Alexis Voeltner, Jul 16, 2024, 1:27 pm |
|
Ventilation Requirements for Sporadically Used SpacesNC-v4 EQp1: Minimum indoor air quality performanceposted by Santiago Avila on Sep 6, 2023, 7:24 am
Hello everyone, I have a question regarding which areas should be ventilated. In our project, a residential building, we have spaces on the ground floor designated for flexible work areas... Last reply: Afogreen Build, Jul 15, 2024, 9:56 pm |
|
Timeline to join for project teamPilot-Credits IPpc90: Social equity within the operations and maintenance staffposted by Christoph Weindl on Sep 25, 2020, 11:27 am
We're pursuing "Social equity within the project team" with Option 2. Under Requirement, it’s stated that “Certifications/reporting must be publicly accessible, be created within 2 years... Last reply: , Jul 15, 2024, 5:59 pm |
|
LTc7- Reduce parking footprint- examplary performamceNC-v4 LTc7: Reduced parking footprintposted by Maria Peralta on Jul 3, 2019, 10:27 am
Hello! I got a question regarding the credit LTc7.The project wich I am working with, doesnt have a parking, so, at is says in the leed guide "Projects with no associated off-street... Last reply: Thomas Lagarde, Jul 15, 2024, 3:11 pm |
|
Breaking Down Energy UsageEBOM-v4.1 EAp3: Energy Performanceposted by H W on Jul 15, 2024, 3:37 am
Hi All, There is a building complex consisting of 2 office towers managed by the same property management company, which share the same chiller plant. Most of the electricity bills are... |
|
Maximum Distance from Parking to SiteNC-v4 LTc7: Reduced parking footprintposted by Laraib Raza on Jul 13, 2024, 3:29 am
Hello All LEED Users,My question is what is the maximum distance allowed from the building(site) to parking? If the Parking is located outside of the site boundary? |
|
Duration of Visit for Retail ProjectEBOM-v4.1 WEc1: Water Performanceposted by sompoche sirichote on Jul 9, 2024, 4:01 am
Not sure this is most rerated credit. We're working on a large retail mall project and are unsure about the best information to use for ARC input regarding visit duration. ... Last reply: Randi B., Jul 13, 2024, 3:50 pm |