Topic | Recent |
---|---|
Ratio Windows/Wall in baseline model Table G1.1.1-1NC-v4.1 EAp2: Minimum Energy Performanceposted by Marc Maso on Jun 23, 2021, 12:10 pm
Dear Srs, I hace a question about the ratio windows/walls in leed v4.1. Is for a building with two differents uses: 3.117 m2 of office and 13.472m2 of warehouse. When we had modeled the... Last reply: Mark Terpstra, May 31, 2023, 4:40 pm |
|
EV Charger has demand response capability but is not Energy StarNC-v4.1 LTc8: Electric Vehiclesposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on Mar 7, 2023, 11:53 am
Hi All, To clarify language for this credit, does "Meet the connected functionality criteria for ENERGY STAR certified EVSE and be capable of responding to time-of-use market signals (... Last reply: Jeff Ross-Bain, PE, LEED Fellow, WELL AP, May 31, 2023, 3:07 pm |
|
ASHRAE 90.1-2016 Appendix G- Baseline Building Vertical FenestrationNC-v4.1 EAp2: Minimum Energy Performanceposted by Mark Terpstra on May 31, 2023, 1:39 pm
Under ASHRAE 90.1-2010, if the fenestration area was less than 40%, the baseline had to match the proposed model for fenestration area. Now in ASHRAE 90.1-2016, there is a table published for the... Last reply: Marcus Sheffer, May 31, 2023, 2:21 pm |
|
Using Dry cooling towerNC-v4 WEc3: Cooling tower water useposted by Michael on May 25, 2023, 11:00 pm
My factory project doesn't use regular Cooling towers, they use Dry coolers (dry cooling towers), which don't use water at all. Can we claim to achieve this credit by no using make-up water?... Last reply: Afogreen Build, May 30, 2023, 8:29 pm |
|
Restroom, public or pivate?NC-v4 EQp1: Minimum indoor air quality performanceposted by Norbert Harmathy on Apr 20, 2023, 11:00 am
Hello, We are working on a historic office building project for LEED New Const. & Major Renovation, and we have restrooms on each floor which are used slowly... Last reply: Afogreen Build, May 30, 2023, 8:27 pm |
|
Whole Building LCANC-v4 MRc1: Building life-cycle impact reductionposted by Nove Sol on May 18, 2023, 7:34 am
I have three questions about whole building LCA. I have a client who wants to evaluate the impact of... Last reply: Spencer Jarrett, May 30, 2023, 2:06 pm |
|
5.4.3.2 Air Leakage application in no heated or cooled spacesWarehouses-NC-v4 EAp2: Minimum Energy Performanceposted by Paola Moschini on May 30, 2023, 5:20 am
About Mandatory Provision ASHRAE 90.1-2010 point 5.4.3.2 Air Leakage. Must this prescription be applied also to fenestration and doors of a warehouse not heated or cooled? We are in Climate zone... Last reply: Marcus Sheffer, May 30, 2023, 10:43 am |
|
Warehouse exhasut ventilationCS-v4.1 EQp1: Minimum indoor air quality performanceposted by Eric Dyer on May 9, 2023, 7:55 pm
Hello, Last reply: Dave Hubka, May 30, 2023, 9:03 am |
|
Electrical Connectors in Waiting Area instead of Loading Dock DoorsWarehouses-NC-v4 LTc8: Green vehiclesposted by Armelle Le Bihan on Mar 1, 2022, 1:42 am
Hi, We are currently pursuing Option 2 for this credit and have a question conerning the location of sockets. In our DC project drivers usually wait in a waiting area rather than in their... Last reply: Cindy Quinn, May 26, 2023, 3:01 pm |
|
Thermal Comfort controlNC-v4 EQc5: Thermal comfortposted by Gail Napell on Sep 2, 2018, 2:56 am
has anyone achieved this credit through Comfy or a similar ap? Last reply: Greg Romanczyk, May 26, 2023, 11:36 am |