Does the project scope for kitchen appliances include future tenants?

NC-v4 WEp2: Indoor water use reduction
posted by Christoph Keck on Apr 25, 2022, 7:47 am

Hi guys,

we are currently in the pre-certification stage of a hotel + retail complex. This complex will host 6 restaurants / fast food joints which will all be leased and one restaurant...

Last reply: emily reese moody, May 13, 2022, 6:58 pm

WEp2- add shower to awarded credit

NC-v4 WEp2: Indoor water use reduction
posted by A&L SUSTENTABILIDADE on Mar 29, 2022, 4:45 pm

During the Design Review, we have submitted the LT pre-requisite/credit Indoor Water Use Reduction and we have earned a total of 6 points. We are now going to submit the Construction Phase and we...

Last reply: emily reese moody, May 13, 2022, 6:45 pm

Submitting Innovation Credits in Design Phase

CI-v4 INc1: Innovation
posted by Kerry Honsinger on Nov 10, 2016, 8:10 pm

We are going to do the 2 part submittal for review and will submit most of the design credits. On the LEED Online website, Innovation is considered a design credit.... and many types of credits...

Last reply: emily reese moody, May 13, 2022, 6:37 pm

exemptions for the location of the permanent entryways systems

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Alexandre DENEUVILLE on Apr 20, 2022, 11:49 am

Hello, 

Can you confirm that the presence of entryway systems can be dispense in the entrances where the traffic of trolley is frequent?

Thank you 

Last reply: emily reese moody, May 13, 2022, 6:34 pm

WC flushing valves to be adjusted manually

NC-v4 WEc2: Indoor water use reduction
posted by Victoria Rios Esteve on Apr 20, 2022, 9:54 am

Hi everyone! On our project, we have installed wc flushing valves that can be manually adjusted to gain higher water use reduction. This is specified in manufacturer's catalogue. This adjustment...

Last reply: emily reese moody, May 13, 2022, 6:32 pm

Roof Typology

Hospitality-NC-v4.1 SSc5: Heat Island Reduction
posted by Francesco Lupoi on Apr 27, 2022, 8:32 am

Hi everyone,

I’m certifying an hotel LEED Gold in Rome. I'm looking for an inverted roof with gravel as finish. Is it good for the credit SS Heat Island Reduction? I have to check...

Last reply: emily reese moody, May 13, 2022, 6:26 pm

biological labs, comfort and process activities

NC-v4 EQc5: Thermal comfort
posted by Francesco Passerini on Mar 29, 2022, 9:47 am

Are biological laboratories considered as regularly occupied spaces? If they are, can they be excluded from the floor surfaces considered for IEQc Thermal comfort since the comfort control for...

Last reply: emily reese moody, May 13, 2022, 6:22 pm

Tenant doesn't install water fixtures- can automatically get 1 point for Option 1- water analysis?

CI-v4 IPc1: Integrative process
posted by Michael on May 12, 2022, 1:15 pm

Hi, My project is interior retail, and they don't install any sanitaryware fixtures in tenant scope. In IP credit, option 1, LEED asked to assess the water fixtures according to WE pre Indoor...

Last reply: emily reese moody, May 13, 2022, 6:14 pm

Advanced Energy Design Guide for Small Warehouses and Self-storage- 50% Energy Savings is Not Available

Warehouses-NC-v4 EAc2: Optimize Energy Performance
posted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on May 9, 2022, 2:48 pm

Hi All,

The prescriptive approach for this credit references the ASHRAE AEDG for 50% energy savings. However, the only AEDG available for small warehouses and self-storage buildings is the...

Last reply: Marcus Sheffer, May 13, 2022, 5:53 pm

Manage rainwater partly out of the LEED project boundary

NC-v4.1 SSc4: Rainwater management
posted by Aris Koliopoulos on Feb 22, 2022, 6:09 pm

Dear All,

We are working on an office project where a new building will be erected next to an existing building. Both buildings are essentially located on the same site area however for...

Last reply: emily reese moody, May 13, 2022, 3:24 pm