Option A: Luminance, UGR is working?

NC-v4 EQc6: Interior lighting
posted by Marius Dabonneville on Nov 13, 2017, 5:43 am

Hi everyone, 

We're actually working on a project in France. Lighting system suppliers only give us the Photometric curv in cd/klm and no in cd/m². The EN 12464 defines luminance with UGR...

Last reply: Regina Ng, Aug 13, 2019, 11:19 pm

Building a new hotel in extension of an old one

LEED Rating System Selection
posted by Marion Touaux on Jul 17, 2019, 6:52 am

Hi, 

I am a bit confused regarding which rating system I should register a project into. The project is to build a new hotel right (about 50 keys) next to an existing...

Last reply: Michelle Rosenberger, Jul 19, 2019, 2:38 pm

PUE calculation

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Marion THIBAULT on Jul 19, 2019, 5:14 am

Dear LEED user,

Someone could tell me, the value that i have to compare to the...

Calculation methodology

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Marion THIBAULT on Jul 2, 2019, 8:51 am

We are currently carrying out a DATA CENTER in France for which we aim for a LEED certification. We have some problems interpreting the EAp1 requirement and perhaps you can help us answer our...

Size of shower and changing facilities

Data-Centers-NC-v4 LTc6: Bicycle facilities
posted by Marion THIBAULT on Jun 27, 2019, 8:42 am

Hi,

Do we have minimum requirements for the size and configuration of changing facility shower ?

Thanks
Marion

Bicycle racks distance

CS-v4 LTc6: Bicycle facilities
posted by Guillaume Rose on May 28, 2018, 5:41 am

Hi, 

In my Project, there are 2 bicycle areas : 

- 1 at the same level as the entrance but the distance is more than 30 meters

- 1 in the basement, but a lift dedicated to...

Last reply: Emily Purcell, Mar 27, 2019, 9:57 am

Green electricity

CS-v4 EAc7: Green power and carbon offsets
posted by Guillaume Rose on Jan 8, 2019, 5:12 am

Hi, 

I work on a 100% electric project.

The owner will subscribe to a 3 year contract with a company that provide a 100% green electricity. On this contract it's specified it will...

Last reply: Marcus Sheffer, Jan 8, 2019, 10:58 am

option 1: No irrigation and rainwater

CS-v4 WEc1: Outdoor water use reduction
posted by Guillaume Rose on Dec 11, 2018, 9:57 am

Hi, 

I would like to know if i can get the points of "option 1 : no irrigation required" if i have no irrigation system on my landscape area but, i use the stored rainwater to water the...

Last reply: David Hubka, Dec 11, 2018, 10:48 pm

Option 3. building and material reuse

CS-v4 MRc1: Building life-cycle impact reduction
posted by Guillaume Rose on Dec 10, 2018, 9:01 am

Hi, 

I would like to know how to count the surface of material reused.

For exemple, in my project, on the floor, i have a subfloor with carpet on it. I have to count the surface of...

Last reply: Tristan Roberts, Dec 10, 2018, 2:48 pm

Achievable point in the case of a non-target criteria

Credit Forums
posted by Guillaume Rose on Nov 12, 2018, 7:30 am

Tristan Roberts Technical Director, The Laurentia Project, HPDC LEEDuser Expert 11454 thumbs up November 12, 2018- 3:11 pm Guillaume, I would post this question to this forum: https://leeduser.buildinggreen.com/credit/CS-v4/LTc3 And I would also review the requirements and guidance on that page. Log in or register to post comments ...

Last reply: Tristan Roberts, Nov 12, 2018, 3:11 pm