posted by Mélanie Bouchenez on Oct 11, 2019, 6:39 am

Hello,

I work on LEED projects in France. The LEED repository specifies when the requirements can respect local standards. Is there a list of French local standards accepted by the USGBC...

ASHRAE 90.1 requirements

NC-v4 EAp2: Minimum Energy Performance
posted by Guillaume Rose on Oct 1, 2019, 5:28 am

Hi, 

I work on a Core & Shell project based in Paris and i have a question about ASHRAE 90.1 Standards, and more especially on the possibility to derogate to certain requirements. On...

Last reply: Guillaume Rose, Oct 2, 2019, 4:07 am

PUE calculation

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Marion THIBAULT on Jul 19, 2019, 5:14 am

Dear LEED user,

Someone could tell me, the value that i have to compare to the...

Last reply: Tyler Thumma, Sep 12, 2019, 1:45 pm

Option A: Luminance, UGR is working?

NC-v4 EQc6: Interior lighting
posted by Marius Dabonneville on Nov 13, 2017, 5:43 am

Hi everyone, 

We're actually working on a project in France. Lighting system suppliers only give us the Photometric curv in cd/klm and no in cd/m². The EN 12464 defines luminance with UGR...

Last reply: Regina Ng, Aug 13, 2019, 11:19 pm

Building a new hotel in extension of an old one

LEED Rating System Selection
posted by Marion Touaux on Jul 17, 2019, 6:52 am

Hi, 

I am a bit confused regarding which rating system I should register a project into. The project is to build a new hotel right (about 50 keys) next to an existing...

Last reply: Michelle Rosenberger, Jul 19, 2019, 2:38 pm

Calculation methodology

Data-Centers-NC-v4 EAp2: Minimum Energy Performance
posted by Marion THIBAULT on Jul 2, 2019, 8:51 am

We are currently carrying out a DATA CENTER in France for which we aim for a LEED certification. We have some problems interpreting the EAp1 requirement and perhaps you can help us answer our...

Size of shower and changing facilities

Data-Centers-NC-v4 LTc6: Bicycle facilities
posted by Marion THIBAULT on Jun 27, 2019, 8:42 am

Hi,

Do we have minimum requirements for the size and configuration of changing facility shower ?

Thanks
Marion

Bicycle racks distance

CS-v4 LTc6: Bicycle facilities
posted by Guillaume Rose on May 28, 2018, 5:41 am

Hi, 

In my Project, there are 2 bicycle areas : 

- 1 at the same level as the entrance but the distance is more than 30 meters

- 1 in the basement, but a lift dedicated to...

Last reply: Emily Purcell, Mar 27, 2019, 9:57 am

Green electricity

CS-v4 EAc7: Green power and carbon offsets
posted by Guillaume Rose on Jan 8, 2019, 5:12 am

Hi, 

I work on a 100% electric project.

The owner will subscribe to a 3 year contract with a company that provide a 100% green electricity. On this contract it's specified it will...

Last reply: Marcus Sheffer, Jan 8, 2019, 10:58 am

option 1: No irrigation and rainwater

CS-v4 WEc1: Outdoor water use reduction
posted by Guillaume Rose on Dec 11, 2018, 9:57 am

Hi, 

I would like to know if i can get the points of "option 1 : no irrigation required" if i have no irrigation system on my landscape area but, i use the stored rainwater to water the...

Last reply: David Hubka, Dec 11, 2018, 10:48 pm