Water Restoration Certificates Pilot CreditNC-v4 INc1: Innovationposted by Lissa Spitz on Sep 13, 2018, 10:50 am
Hi, can anyone confirm if the volume is supposed to be for the baseline or design annual water use? thanks! Last reply: Aliesa Adelman, Jul 26, 2022, 12:06 pm |
|
Choosing the correct rating systemData-Centers-NC-v4 MPR3: Must comply with project size requirementsposted by Dina El-Sady on Jul 26, 2022, 9:45 am
A data cebter building with the white area contributing to only 7% of the total BUA while the rest are offices, elec rooms , video rooms...etc , should it be treated as a data center rating... |
|
Indoor Air Quality AssessmentLEED v4.1 Discussion Forumposted by Theresa Scherwitz on Jul 26, 2022, 7:36 am
We were planning to achieve Option 2. Air Testing (2 points) for EQ Credit: Indoor Air Quality Assessment. There are fabric wrapped acoustic panels that will not be installed until after the... |
|
v4.1 Tier 1: Onsite Renewable PV InstallationNC-v4.1 EAc5: Renewable energyposted by Stephanie Graham on May 3, 2021, 1:22 am
The title of Table 1--"Points for Renewable Energy Procurement" is confusing, as it includes Tier 1. As you indicated under another comment in this credit, it is possible to procure onsite... Last reply: Stephanie Graham, Jul 25, 2022, 11:57 pm |
|
Grounwater contamination at the campus levelNC-v4 LTc3: High priority siteposted by Bret Mantyk on Jul 12, 2022, 12:03 pm
I'm working on a project that is considering pursing the LTc3 High Priority Site credit, Option 3... Last reply: Dave Hubka, Jul 25, 2022, 10:01 pm |
|
LEED 4.1: Is the exam based on the Beta version published on January 2019?LEED Exam Discussionposted by Ayman Raouf on Jul 14, 2022, 12:28 pm
Is the LEED AP exam based on the Beta version published on January 2019? Last reply: Paula Melton, Jul 25, 2022, 12:04 pm |
|
LEED v4 Interior Lighting Quality Option 2- Strategy CNC-v4 EQc6: Interior lightingposted by Ciaran McCabe on Dec 5, 2018, 2:34 pm
LEED v4 Interior Lighting Quality Option 2 - Strategy C When L70 information is not available for LEDs can other rated life values (such as L90 B10 @ 50,000 Hours or the... Last reply: Edgar Arevalo, Jul 25, 2022, 11:14 am |
|
Circular requirementsPilot-Credits INpc138: Managing Indoor Air Quality for Infection Controlposted by Trista Brown on Apr 23, 2021, 7:01 pm
Under requirement #3. Inspection and Maintenance, this credit asks teams to "consider" two other Safety First pilot credits. It's not clear if these are noted purely for reference, or if some of... Last reply: Rick Walls, Jul 25, 2022, 10:52 am |
|
vegetated wallsPilot-Credits SSpc55: Bird collision deterrenceposted by Roberto Camarillo on Jul 22, 2022, 5:37 pm
Helllo. Vegetated walls can attract birds to the buildings. Sometimes these vegetated walls on the facades are close to glazed surfaces. How can facades be attractive to biodiversity,... |
|
Substituted LEED 4.1 Form on a LEED v4 projectNC-v4.1 IPc1: Integrative processposted by Vincent Pieri on Jul 19, 2022, 2:02 pm
Hello, We are finishing-up QA/QC on a LEED v4 project where we prepared the IP credit and uploads using LEED v4 protocols and the LEED form was recently substituted for the LEED v4.1 IP... Last reply: Marcus Sheffer, Jul 22, 2022, 11:20 am |