Topic | Recent |
---|---|
REACH registration numberNC-v4 MRc4: Building product disclosure and optimization - material ingredientsposted by Francesco Passerini on Jul 8, 2019, 5:53 am
In safety data sheets the calcium diformat is labeled with REACH registration number 01-2119486476-24-xxxx Therefore I would think that it is included in the REACH lists but in the REACH... Last reply: allen cole, Aug 15, 2022, 8:33 pm |
|
Two unidentical buildings from same owner/management for what approach?EBOM-v4 MPR2: Must use reasonable LEED boundariesposted by Eric Bautista on Aug 14, 2022, 11:45 pm
I would like to emphasize the general details of this project for LEED v4 or v4.1 O+M certification. There are 2 existing buildings (Building A and B) in a property boundary and these are ... |
|
Lighting control + color rendering requirements for v4.1NC-v4.1 EQc6: Interior lightingposted by Ashleigh Fischer on Aug 11, 2022, 2:29 pm
Can anyone confirm if v4.1 requires color rendering / color fidelity index requirements to be met to achieve the Lighting Control option? LEEDuser does not state this, but the credit language... Last reply: emily reese moody, Aug 14, 2022, 1:07 pm |
|
LEED v4.1 Campus Group projectLEED Guidance for Campuses and Multiple Buildingsposted by Aishwarya Chengappa on Aug 12, 2022, 9:08 am
Is it possible to register a campus & group project with a v4.1 BD+C rating sytsem? As on LEED Online, we are not able to register such a project and there is no gudiance avaiable... Last reply: Dave Hubka, Aug 13, 2022, 11:10 pm |
|
Phased Development- Demoing Building for Parking LotNC-v4 MPR2: Must use reasonable LEED boundariesposted by Deb Favaretto on Jul 20, 2022, 12:52 pm
Hi, I am working on a project that has a two phases of construction. Phase 1 consists of constructing a new building and sitework. Phase 2 involves demolishing an existing building and... Last reply: Dave Hubka, Aug 13, 2022, 9:23 am |
|
62.1 vs 170NC-v4 EQp1: Minimum indoor air quality performanceposted by Dianne Herrin on Sep 26, 2016, 10:11 am
Hello - I am working on a new construction VA Medical Center that has been designed using the ventilation rates in ASHRAE Standard 170-2008 as per the v4 NC-Healthcare. Can we still qualify for... Last reply: Michelle Bombeck, Aug 12, 2022, 4:48 pm |
|
Gross Floor Area for FlushoutsNC-v4 EQc4: Indoor air quality assessmentposted by Cory Duggin on Aug 16, 2021, 4:08 pm
Should the penthouse be included in the gross area used to calculate the flush out volume? Also, does it have to be specific on a system by system basis, such as the area of the floor served by... Last reply: Dave Hubka, Aug 12, 2022, 2:27 pm |
|
Low Emitting Materials Calculator and Precast Wall PanelsNC-v4 EQc2: Low-emitting materialsposted by Teaaron Frye on Aug 11, 2022, 3:41 pm
In regards to the low emitting materials calculator (v4.1) what is the proper way to document insulated and non-insulated precast concrete wall panels. Last reply: Jack Statham, Aug 12, 2022, 11:59 am |
|
Modeling a warehouse that is divided into multiple typical unitsCS-v4 EAc2: Optimize Energy Performanceposted by Michael on Aug 12, 2022, 4:40 am
My project is a big dry warehouse, which is divided into 7 typical units for future tenants. There is a small office with AC in each unit. My question is can we model 1 typical unit, then... Last reply: Marcus Sheffer, Aug 12, 2022, 9:37 am |
|
RECs for project supplied by campus central utility plant?NC-v4 EAc7: Green power and carbon offsetsposted by Erin Holdenried on Jul 20, 2022, 4:11 pm
Can RECs be used for project located on a campus with a central plant that generates its own electricity for the campus? It is a cogen plant that also supplies steam and chilled water. Last reply: Erin Holdenried, Aug 11, 2022, 5:53 pm |