Topic | Recent |
---|---|
Exterior doors/windows in v4.1NC-v4.1 EQc2: Low-emitting materialsposted by Emily Purcell on Jan 5, 2021, 2:36 pm
Hi all, I'm looking at this past thread on the v4 Low-Emitting credit and how to account for exterior doors: ... Last reply: Jennifer Kruse, Jun 28, 2023, 10:00 am |
|
Construction IAQ Management Plan during demolition phase?NC-v4 EQc3: Construction indoor air quality management planposted by Elizabeth Kertesz on Sep 1, 2018, 11:06 am
For a major renovation project, should we implement the... Last reply: Afogreen Build, Jun 27, 2023, 12:12 pm |
|
how can attachments (drawings, images) be sent in a CIR?NC-v4 IPc1: Integrative processposted by Sara BENLOUBA on May 25, 2023, 4:45 am
Dear Everybody, We would like to send a... Last reply: Afogreen Build, Jun 27, 2023, 12:08 pm |
|
TOD No Minimum for ParkingNC-v4 LTc7: Reduced parking footprintposted by Graham Linn on Jun 23, 2023, 8:00 pmto reduce its parking below that minimum. It does sound a bit stretch-y but it's very much in line with the intent of the credit. There are a lot of posts in this forum asking what to do if the ITE... Last reply: Graham Linn, Jun 26, 2023, 12:18 pm |
|
Renewable energyEBOM-v4.1 EAp3: Energy Performanceposted by SAMY Chamy on Jun 23, 2023, 9:16 am
Hi Team, We have received an inquiry from a large corporation with more than 20 buildings on the same campus that has 2.5 MW of solar on its roof and operates with net metering (... |
|
Creating Baseline building Shell based on ΑSHRAE 90.1-2010- proposed building walls with more than 40% of glassNC-v4 EAc2: Optimize Energy Performanceposted by Konstantina Kalliakoudi on Jun 16, 2023, 3:52 am
Hello to all LEED Users, My proposed building has following percentage of glass at each orientation: NE: 90% percentage of glass SE: 90% percentage of glass NW: 90%... Last reply: Konstantina Kalliakoudi, Jun 23, 2023, 4:20 am |
|
Insulation in Interior walls for Vault Spaces in Data CenterNC-v4 EAc2: Optimize Energy Performanceposted by Rajat Wadhwa on Jun 22, 2023, 4:47 pm
Hi Everyone, We are modeling A Data center and the internal walls forvault spaces have insulation in them because of high temperature in the data center vault spaces, Now I am... Last reply: Marcus Sheffer, Jun 22, 2023, 4:52 pm |
|
Justification of usign the 9.6.2 Additional Power lighting in the Baseline ModelNC-v4.1 EAp2: Minimum Energy Performanceposted by Marc Maso on Jun 19, 2023, 12:22 pmsome post in this forum where the additional power has been defined as process load. For example: https://leeduser.buildinggreen.com/forum/additional-interior-lighting-power-1 We use this assumption... Last reply: Marcus Sheffer, Jun 22, 2023, 10:56 am |
|
Minimum Outside air in DCV systemsNC-v4.1 EQp1: Minimum indoor air quality performanceposted by Marc Maso on Jun 22, 2023, 9:16 am
Dear Srs, we are using the DCV strategy in one building. The doubt are when we need to ventilated or not... A room have a schedule of 8am to 18:00
|
|
Regional Priority credit for an L&T creditCI-v4 LTc1: LEED for Neighborhood Development locationposted by Cindy Quinn on Jun 20, 2023, 5:54 pm
Our project is located in an ND Gold certified neighborhood. If we pursue the LEED for ND location credit in leiu of other L&T credits, how can we receive a Regional Priority point for... Last reply: Dave Hubka, Jun 21, 2023, 9:35 pm |