Log in
Forum
Topic

Sample testing required?

Pilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogens
posted by on Sep 19, 2023, 12:48 pm

Hello everyone,

Looking to understand better the requirements on the Sample testings side for this pilot credit. Do we need to submit an actual testing sample performed, with results? or...

Last reply: Kari Botek, Jul 17, 2024, 1:56 pm

Joint Compound and Joint Tape- GREENGUARD Gold requirements

NC-v4.1 EQc2: Low-emitting materials
posted by Jason Biondi on Jul 29, 2019, 3:08 am

Here is the technical advice we receive for one of the project:

"Provide general emissions evaluation results for ProForm All Purpose Joint Compound and Joint Tape. The documentation for...

Last reply: Edgar Arevalo, Jul 17, 2024, 1:50 pm

Integrative Analysis of Building Materials

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by on Jan 5, 2023, 10:45 am

The project team is pursuing this pilot credit after achieving BPDO EPD and HPD credits. Analyzing a combination of EPDs, HPDs, and Safety Data Sheets for the products installed allowed the team...

Last reply: Gabrielle Gambino Lyon, Jul 17, 2024, 12:14 pm

Hard-lid ceiling with access panel

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by on Jul 16, 2024, 2:42 pm

For interior cross-contamination prevention - Has anyone successfully submitted a project with an access panel in a hard lid ceiling? Deck to deck partitions aren't feasible for the janitor's...

RECs in EBOM 4.1

EBOM-v4.1 EAp3: Energy Performance
posted by Christian Garcia on Apr 18, 2024, 10:50 am

I came across an old video where it is explained this version doesn't take into account the purchase of RECs but it is considered for the future. This video is from 5 years ago. Does anyone know...

Last reply: Alexis Voeltner, Jul 16, 2024, 1:27 pm

Ventilation Requirements for Sporadically Used Spaces

NC-v4 EQp1: Minimum indoor air quality performance
posted by Santiago Avila on Sep 6, 2023, 7:24 am

Hello everyone,

I have a question regarding which areas should be ventilated. In our project, a residential building, we have spaces on the ground floor designated for flexible work areas...

Last reply: Afogreen Build, Jul 15, 2024, 9:56 pm

Timeline to join for project team

Pilot-Credits IPpc90: Social equity within the operations and maintenance staff
posted by Christoph Weindl on Sep 25, 2020, 11:27 am

We're pursuing "Social equity within the project team" with Option 2.

Under Requirement, it’s stated that “Certifications/reporting must be publicly accessible, be created within 2 years...

Last reply: , Jul 15, 2024, 5:59 pm

LTc7- Reduce parking footprint- examplary performamce

NC-v4 LTc7: Reduced parking footprint
posted by Maria Peralta on Jul 3, 2019, 10:27 am

Hello!  

I got a question regarding the credit LTc7.The project wich I am working with, doesnt have a parking, so, at is says in the leed guide "Projects with no associated off-street...

Last reply: Thomas Lagarde, Jul 15, 2024, 3:11 pm

Breaking Down Energy Usage

EBOM-v4.1 EAp3: Energy Performance
posted by H W on Jul 15, 2024, 3:37 am

Hi All,

There is a building complex consisting of 2 office towers managed by the same property management company, which share the same chiller plant. Most of the electricity bills are...

Maximum Distance from Parking to Site

NC-v4 LTc7: Reduced parking footprint
posted by Laraib Raza on Jul 13, 2024, 3:29 am

Hello All LEED Users,My question is what is the maximum distance allowed from the building(site) to parking? If the Parking is located outside of the site boundary?