Project BoundaryHealthcare-v4.1 LTc2: Sensitive land protectionposted by Jordi Castellano on Feb 13, 2023, 10:29 am
Good afternoon, According to the LEED v4.1 handbook, if we locate the project on land where it was already developed, but our project goes a little over the boundaries, do we have to get... Last reply: Dave Hubka, Feb 15, 2023, 1:23 pm |
|
Model service infrastructure for energy simulationNC-v4 EAp2: Minimum Energy Performanceposted by Linh Dang on Feb 15, 2023, 5:17 am
Dear all We are doing an energy simulation for a factory project and it has a wastewater treatment building using AC and OA fans. Now we only model the manufacturing building. So do we... |
|
Street Light BUG RatingNC-v4 SSc6: Light Pollution Reductionposted by Danielle Waters on Feb 13, 2023, 2:22 pm
If Street Lights on the public sidewalk adjacent to public streets are within project scope and LEED Boundary, are they required to comply with BUG Rating? What if fixtures are required by city... Last reply: Danielle Waters, Feb 14, 2023, 4:15 pm |
|
HydrozonesNC-v4 WEp1: Outdoor water use reductionposted by Charles Hall on Feb 13, 2018, 5:11 pm
I am a little unsure about how to generate hydrozone areas. For instance, with a... Last reply: Julio Fernandez Amodia, Feb 14, 2023, 11:02 am |
|
Biophilic design planPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Priscillia Champagne on Jun 2, 2022, 8:16 am
I understand that the final result must be that the project implements five distinct design strategies. What is more difficult to grasp is how the "Design with nature documentation template"... Last reply: Adriana Hansen, Feb 13, 2023, 4:44 pm |
|
Modeling District Energy via Option 1 path2 full DESNC-v4 EAc2: Optimize Energy Performanceposted by elvin ruya on Feb 13, 2023, 3:36 pm
Hi, For a campus project, we would like to go with option 1 path2 full... |
|
Waling Distance 400 m or 800 m?CS-v4 LTc5: Access to quality transitposted by Stephan Zweig on Feb 10, 2023, 3:26 am
Dear all, 1) Does subway station as... Last reply: Konstantina Kalliakoudi, Feb 13, 2023, 10:58 am |
|
How to get points on Material IngeridentNC-v4.1 MRc2: Environmental Product Declarationsposted by Nagaraj Sankar on Feb 13, 2023, 2:40 am
Hi User , One of our project ,20 permanently installed materials are purchased under the EPD credit on one of our projects. we can reach 2 points on that credit, but the client... Last reply: Gustavo De las Heras Izquierdo, Feb 13, 2023, 10:25 am |
|
Regarding Energy SimulationData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Nagaraj Sankar on Feb 8, 2023, 6:25 am
One of our data center projects has an electrical room. This electrical room didn't have regular occupants. In this case, do we need to provide fresh air for that space? In Ashrae 62.1 (... Last reply: Tyler Thumma, Feb 13, 2023, 7:48 am |
|
Lighting Mandatory Provision in Tenant spaceCS-v4 EAp2: Minimum Energy Performanceposted by Teerawat W. on Feb 6, 2023, 4:58 am
Our project is a core and shell office. The owners are provided with complete lighting fixtures in the tenant space (shell). 1. Does this space need to comply with all requirements under... Last reply: Tyler Thumma, Feb 13, 2023, 7:45 am |