TUV PROFiCERT acceptable for VOC emission?NC-v4.1 EQc2: Low-emitting materialsposted by sompoche sirichote on Jun 13, 2023, 5:08 am
Hi, Could anyone help confirm if LEED consider products with TUV PROFiCERT-product Interior / Interior PREMIUM mark meeting v4.1... Last reply: Harry James201, Aug 12, 2024, 6:17 am |
|
Lighting Mandatory Provision in Tenant spaceCS-v4 EAp2: Minimum Energy Performanceposted by Teerawat W. on Feb 6, 2023, 4:58 am
Our project is a core and shell office. The owners are provided with complete lighting fixtures in the tenant space (shell). 1. Does this space need to comply with all requirements under... Last reply: Tyler Thumma, Feb 13, 2023, 7:45 am |
|
Do off-street parking facilities that are not surface-parking require carpool or car-sharing parkingND-Plan-v4 NPDc5: Reduced parking footprintposted by Pongpitch J. on Jun 8, 2022, 12:38 am
Hi, Our project does not have any surface parking (outdoor lots or single-story parking facilities not under habitable buildings). The project does not have any existing parking facilities... |
|
Not enough parking space within a 60-meter range of the entrances to fit all preferred parkingND-Plan-v4 NPDc5: Reduced parking footprintposted by Pongpitch J. on Jun 8, 2022, 12:41 am
Hi, The project plans to provide 10% carpool and shared-use vehicle parking; however, only some of the preferred parking can fit into the available lots within a 60-meter range of... |
|
Renovation Project with Zero Lot LineCS-v4 WEp1: Outdoor water use reductionposted by Somsak Jidmon on Feb 28, 2022, 9:54 am
I got a renovation project of the 7 stories existing building to the office which aims to be LEED-CS but the project contains zero lot line. Is it possible to pass this prerequisite? Last reply: Somsak Jidmon, Mar 30, 2022, 10:16 am |
|
Pumping requirements- District cooling systemND-Plan-v4 GIBc12: District heating and coolingposted by Vincent Dupuy on Sep 27, 2018, 10:07 am
Hello, The credit requires that : "annual district pumping energy consumption that exceeds 2.5% of the annual thermal energy output of the heating and cooling plant must be offset by... Last reply: Eliot Allen, Mar 23, 2022, 1:34 pm |
|
Different LEED certification level for 1 building but 2 uses. Is it possible?LEED Guidance for Campuses and Multiple Buildingsposted by Panita Varaurairat on Mar 5, 2019, 8:16 am
For the mixed-uses building (Podium as a retail & tower as an office), 1) Can we apply for 2 LEED rating system? (LEED NC for retail & LEED CS for office) 2) Can we apply... Last reply: Susan Di Giulio, Jun 2, 2021, 2:37 pm |
|
Tenant lighting fixtures installed but not wired upCS-v4 EAp2: Minimum Energy Performanceposted by Varunya Jarunyaroj on May 27, 2021, 12:33 pm
The owner of our LEED V4 CS project plan to provide lighting fixtures on the ceiling grid in the tenant space; however, they the wiring and control will be done by tenants due to different leased... Last reply: Marcus Sheffer, May 27, 2021, 3:07 pm |
|
Minimum Requirement for Bicycle Facilities CreditNC-v4 LTc6: Bicycle facilitiesposted by Nuttanee Vongveeranonchai on Aug 25, 2020, 7:30 am
Dear All, I have a question regarding the minimum requirement of the Bicycle facilities credit. Our project is a conference center located in the center of Bangkok, Thailand.... |
|
Track light power consumptionRetail-CI-v4 EAp2: Minimum Energy Performanceposted by Mahesh Shankar on Mar 11, 2020, 7:07 am
This one is a retail project in Thailand. The store has many tracklights due to which we are not able to get the required power savings in lighting. I know that installing current limiters for... Last reply: Marcus Sheffer, Mar 11, 2020, 8:55 am |