Topic | Recent |
---|---|
Cooling Tower is used for process water (Factory project)NC-v4 WEc3: Cooling tower water useposted by Youssef Hisham on Mar 1, 2023, 5:54 am
We are in a factory project and the cooling tower is used for the process water for the factory equipment. So, Does the cooling tower credit requirement applies to our project ? Last reply: Afogreen Build, Jul 19, 2023, 12:29 am |
|
Education Programs required to be about the LEED buildingNC-2009 IDc1: Innovation in Designposted by Lawrence Lile on Jun 4, 2015, 1:44 pm
You can have a wonderful environmental education program, but if it doesn't talk about the LEED building, it will get rejected. Just had a long discussion with a LEED reviewer after a denied... Last reply: Sarah Wood, Jul 18, 2023, 9:29 pm |
|
MRc2 BPDO EPD Option 2 Multi Attribute OptimizationNC-v4.1 MRc2: Environmental Product Declarationsposted by Sarah Linke on Feb 24, 2021, 3:24 pm
Has anyone had success pursuing credit for the BPDO EPD Option 2 (Multi Attribute Optimization)? The companies I have had success finding documentation for are as follows: Owens Corning (... Last reply: Sarah Linke, Jul 18, 2023, 1:20 pm |
|
EQpc123- Designing with Nature, Biophilic Design for the Indoor EnvironmentPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Sarah Linke on May 23, 2023, 10:05 am
We pursued the Pilot credit Designing with Nature, Biophilic Design for the Indoor Environment on a new elementary school and were able to highlight all of the natural elements and focus on how... Last reply: Fran Bellin, Jul 18, 2023, 10:56 am |
|
Ventilation in corridorsNC-v4 EQp1: Minimum indoor air quality performanceposted by Luana Jerez on Jul 18, 2023, 9:30 am
We are working on an office building 17 meters wide, on one floor, the layout is a 3.5-meter distribution corridor, serving as a division between two rows of offices. These offices are equipped... |
|
LEED 4.1 testing requirements to recertifyNC-v4 EQc4: Indoor air quality assessmentposted by Russ Pellegrino on Jul 18, 2023, 9:37 am
Does anyone know of any differences in the LEED V4.1 and the LEED O+M... |
|
Required Materials for LCANC-v4 MRc1: Building life-cycle impact reductionposted by RDK E&S on Jan 10, 2020, 4:06 pm
Hello, We are looking for more information as to what details from Baseline and Proposed models need to be included in the models.
Last reply: Bipin Karki, Jul 17, 2023, 3:04 pm |
|
core and shell data centerData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Amgad Khattab on Jul 16, 2023, 4:23 am
Hi everyone, I'm working on a LEED project for a core and shell data center. The client has not yet purchased the servers, so we don't have any information about their efficiency. I'm... Last reply: Amgad Khattab, Jul 17, 2023, 1:46 pm |
|
How do you evaluate time period of work towards submitting credit-related documentation for application?Performance Periodposted by Marine Petrosyan on Jul 17, 2023, 11:23 am
Hi! Would appreciate it, if you could help with the following question. How do you count the time, required for preparation of documentation for each credit / prereq? Will you... |
|
Pest managementEBOM-v4 EQc9: Integrated pest managementposted by VISHESH AGARWAL on Aug 19, 2016, 6:10 am
I am working on the project where it is difficult to use SF Tier-3 pesticide as per the LEED Norms. Project is currently using CIB (Central Insecticides Board) which is the apex organization for... Last reply: Catarina Costa Goncalves, Jul 17, 2023, 10:49 am |