Water Calcultion for Commerical ID+C projectCI-v4 WEc1: Indoor water use reductionposted by Amgad Khattab on Aug 16, 2023, 7:51 am
We have a project with the following : - Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area. Hint: - the building containing... Last reply: emily reese moody, Aug 17, 2023, 2:03 pm |
|
Rating System Selection [ID+C or BD+C]LEED Rating System Selectionposted by Amgad Khattab on Aug 16, 2023, 6:15 am
We have a project with the following description: - the building is 10 floors and the owner renting the whole building. - The Building envelope construction is complete. -... |
|
core and shell data centerData-Centers-NC-v4 EAp2: Minimum Energy Performanceposted by Amgad Khattab on Jul 16, 2023, 4:23 am
Hi everyone, I'm working on a LEED project for a core and shell data center. The client has not yet purchased the servers, so we don't have any information about their efficiency. I'm... Last reply: Amgad Khattab, Jul 17, 2023, 1:46 pm |
|
Option 2:Only CO2 sensorsCS-v4 EQc1: Enhanced indoor air quality strategiesposted by Dina El-Sady on Apr 11, 2022, 6:48 am
The project is totally mechanically ventilated .I am choosing adding CO2 sensors in dense areas for option 2 for additional... Last reply: Michelle Rosenberger, Apr 13, 2022, 10:12 am |
|
Preparing concept HVAC requirementsNC-v4 EAc2: Optimize Energy Performanceposted by Dina El-Sady on Nov 30, 2021, 9:48 am
Is it a must to start a simple box energy model for a new project to extract HVAC requirements to acheive a certain level of energy savings? Oe is there a guide that can be used to extract... Last reply: Marcus Sheffer, Nov 30, 2021, 10:06 am |
|
Path 1. Divert 50% and Two Material Streams (1 point)NC-v4 MRc5: Construction and demolition waste managementposted by Ayman Khulief on Apr 29, 2021, 4:40 am
Hello! I represent a Solid Waste Management company often subcontracted to divert wastes from LEED projects. I have a silly question regarding Option 1. Diversion (1–2 points)... Last reply: Susan Di Giulio, Oct 25, 2021, 2:04 pm |
|
Can we certify only the administrative building in a pharmaceutical factory project?NC-v4 MPR2: Must use reasonable LEED boundariesposted by Amgad Khattab on Jun 22, 2021, 11:43 am
We have a pharmaceutical factory project consists of the following buildings: - Last reply: Dave Hubka, Jun 24, 2021, 9:58 pm |
|
ASTM E1527-13 equivalent standard in EuropeSchools-NC-v4.1 SSp2: Environmental Site Assessmentposted by Alexandre DENEUVILLE on Jun 16, 2021, 5:04 am
Dear all, We have to carry out an environmental... |
|
Boarding schoolNC-v4 LTc5: Access to quality transitposted by Hossam Jacoup on Dec 15, 2020, 4:30 am
?Is option 2 in Access to quality transit credit can be applied for boarding school project Specially that students will not leave the school during weekdays as there a hostel in the... |
|
municipality irrigation lineCS-v4 WEc1: Outdoor water use reductionposted by Radwa Amin on Apr 1, 2017, 11:54 am
the district that the project is located in has a municipality water line dedicated to irrigation and it is not potable water (recycled). Last reply: , Oct 15, 2019, 3:26 am |