Topic | Recent |
---|---|
Last chance to comment on LEED v5LEED v5 BD+C/ID+C: Overall and Appendix 2nd Public Commentposted by Nadav Malin on Sep 27, 2024, 9:53 am
Weigh in on the second public comment draft of LEED v5 here. You can reply to this thread or use the "Post a Question/Comment" button to start a new thread. The... Last reply: Harry Flamm, Oct 22, 2024, 9:32 pm |
|
Testing Protocol and Training RequirementsPilot-Credits INpc137: Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Glen Boldt on Oct 22, 2024, 8:39 pm
Cleanliness Protocols: Wondering if there has been any pushback from Operators/Facility staff on these protocols and the training requirements? |
|
How to calculate EFLH in a Minimum calcuratorRetail-CI-v4 EAp2: Minimum Energy Performanceposted by on Oct 22, 2024, 2:21 am
Dear all, We’re currently simulating for only one store area in a department building pursuing LEED v4 Certification. The project has received the following observations from... Last reply: Iqbal Khalilullah, Oct 22, 2024, 7:27 pm |
|
EQc Low Emitting Materials- butyl sealant that meets requirementsNC-v4 EQc2: Low-emitting materialsposted by Theresa Lehman on Oct 21, 2024, 5:07 pm
The subcontractor supplying the commercial kitchen equipment for a project included a sealant (Premier XtraBond 1500NS) in their submittal that is not compliant with the LEED EQc Low-Emitting... Last reply: Kimberly Lombardozzi, Oct 22, 2024, 2:12 pm |
|
Fire alarm cables (Public Address system) in the hospitalsHealthcare-v4 MRc6: PBT source reduction - lead, cadmium and copperposted by Najam Us Saqib on Apr 7, 2022, 2:54 am
Fire alarm cables are same like electrical cables, however, its function is different. The v4 LEED guide uses the words ''Electrical wiring and cabling'' under Lead requirements (... Last reply: Michelle Bombeck, Oct 22, 2024, 11:52 am |
|
Defined terms used in the credit language must be clearly identifiedLEED v5 BD+C/ID+C: Overall and Appendix 2nd Public Commentposted by Glenn Heinmiller on Oct 20, 2024, 6:01 pm
I understand that definitions of defined terms are being moved to the reference guide. Therefore it becomes extremely important that defined terms be clearly identified in the credit language... Last reply: Emily Purcell, Oct 22, 2024, 10:00 am |
|
Sky type for Option 2: IlluminanceNC-v4.1 EQc7: Daylightposted by Junaid Mujahid on Oct 7, 2024, 2:17 am
If anyone has used IES-VE's RadianceIES application for Daylight Simulation Option 2: Illuminance, what sky type within RadianceIES should be selected for demonstrating compliance? ... Last reply: Christopher Widdowson, Oct 21, 2024, 2:53 pm |
|
Utilize emergency generator for peak demand reductionNC-v4.1 EAc4: Grid Harmonizationposted by Brightworks Sustainability on Oct 19, 2024, 5:54 pm
Hello, The project includes fossile fuel based emergency generator. Can we utilize the energency generator to comply with GH credit intent? Last reply: Marcus Sheffer, Oct 21, 2024, 1:52 pm |
|
Design for Indoor Air Quality and Infection ControlPilot-Credits EQpc124: Performance-based indoor air quality design and assessmentposted by Rihab Joucht on Oct 21, 2024, 10:40 am
Hello everyone! I'm pursuing this pilot credit for a LEED v4 NC warehouse building and office, located in Longueuil. Any tips to share ? |
|
LTc4 and buildable landNC-v4 LTc4: Surrounding density and diverse usesposted by Jacopo Cattaruzzi on Oct 21, 2024, 8:33 am
Hi, I am following a project of a hotel complex located in the Italian alps. We are aiming at achieving points from LTc4 opt. 1 and I am a bit confused about... |