Do Daylight and Views Credits Require the Same Regularly Occupied Space?Warehouses-NC-v4 EQc7: Daylightposted by Alefiya Bhiwandiwala on Nov 12, 2024, 2:41 am
I have a question about a project with a core production/... |
|
Fire alarm cables (Public Address system) in the hospitalsHealthcare-v4 MRc6: PBT source reduction - lead, cadmium and copperposted by Najam Us Saqib on Apr 7, 2022, 2:54 am
Fire alarm cables are same like electrical cables, however, its function is different. The v4 LEED guide uses the words ''Electrical wiring and cabling'' under Lead requirements (... Last reply: Michelle Bombeck, Oct 22, 2024, 11:52 am |
|
Modeling a 100% fresh air Makeup AHU (MAHU) in BaselineNC-v4 EAc2: Optimize Energy Performanceposted by Hanin Hamdan on Jul 26, 2024, 2:44 am
Hi, I am working on a Hotel Project with several Kitchen Spaces. 100% Fresh air Makeup Air Handling Units (MAHUs) are designed to supply makeup air at the hood and Ecology Units are... Last reply: Tyler Thumma, Sep 5, 2024, 8:19 am |
|
Heat Island Mitigation with Cool WallsCS-v4.1 INc1: Innovationposted by Hoda Ibrahim on Aug 22, 2024, 6:02 am
I have worked in a project that used wall materials selected based on their high... |
|
Modeling of Steam Humidifiers in the BaselineNC-v4 EAc2: Optimize Energy Performanceposted by Hanin Hamdan on Jul 26, 2024, 2:32 am
Hi, I am working on a Mixed Hotel Project with Amenities and Residences in a Hot and Dry Climate, Zone 1B. The Fresh AHUs (with Energy Recovery Wheels) are equipped with a A Steam... Last reply: Marcus Sheffer, Aug 2, 2024, 6:01 pm |
|
Ecology Unit in Mechanical DesignNC-v4.1 EAp2: Minimum Energy Performanceposted by Mu'ath Ad on Jul 4, 2024, 9:22 am5903 thumbs up July 5, 2024- 10:30 am Your question is not appropriate for this particular forum. From an energy perspective such an air cleaning device would be considered a process load and simply... Last reply: Marcus Sheffer, Jul 5, 2024, 11:24 am |
|
If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarNC-v4 WEc1: Outdoor water use reductionposted by Nandan Tavkar on Jun 19, 2024, 5:39 am
If i demonstrate prerequisite compliance with calculator and further if my project uses recycled water then will project be awarded as 100% reduction (2 points)? Please confirm Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:40 am |
|
Recycled Content Report (Post-Consumer & PreConsumer)NC-v4.1 MRc3: Sourcing of Raw Materialsposted by Mu'ath Ad on Jun 7, 2024, 2:02 pm
Hi, in my current project I am dealing with a manufacturer who provided the Recycled Content with percentage report with mention whether is post-consumer or pre-consumer for some reasons. ... Last reply: Andrey Kuznetsov, Jun 21, 2024, 10:34 am |
|
Air Testing Agency Hiring RequirementsCI-v4 EQc4: Indoor air quality assessmentposted by Amgad Khattab on Jun 4, 2024, 1:09 am
Hi All, I'm working on a commercial interiors project that's pursuing both option.2 Air testing. My question is, is it acceptable that the contractor hire an accredited professional... Last reply: Andrey Kuznetsov, Jun 4, 2024, 1:18 am |
|
No fresh mechanical fresh air intake bieng implementedNC-v4.1 EQp1: Minimum indoor air quality performanceposted by Mahnoor Ali on May 14, 2024, 4:53 am
Hello community, I'd really like any of you guys help with this So our building is a dwelling unit with multiple rooms where labour/ workers will be living each each room has access to outdoors... Last reply: Andrey Kuznetsov, May 14, 2024, 11:11 am |