Forum » United Arab Emirates
Topic

Concern regarding entryway systems

EBOM-v4.1 EQc1: Green Cleaning
posted by Wafa Arif on Jan 25, 2024, 4:01 am

Hello,

Under option 2 - Entryway systems, we need to put in place 10 feet elements in the primary direction of travel.

In our hotel project, the double door entrances leave no space...

Last reply: Stephen Ashkin, Feb 5, 2024, 1:33 pm

Parksmart- Parking Detection for a Mixed Project

Parksmart Discussion Forum
posted by Alokmay Behera on Nov 9, 2023, 12:55 am

Greetings.

I am working on a mixed project targeting Parksmart for the parking area. In the design stage, the credits B3 and B4- Way Finding Systems- External and Internal were targeted....

Last reply: Paul Wessel, Nov 10, 2023, 9:44 am

U value compliance for Revolving Doors

NC-v4 EAp2: Minimum Energy Performance
posted by Alokmay Behera on Oct 23, 2023, 4:37 am

I am working on a LEED project with revolving doors. The targetted U value for glaze is 1.9 W/Sqft.K (including frames),...

Last reply: Alokmay Behera, Oct 23, 2023, 5:13 am

Clarification on the non-roof measure area

EBOM-v4.1 SSc2: Heat Island Reduction
posted by Wafa Arif on Oct 18, 2023, 4:41 am

I'm in need of guidance regarding the documentation process for the Heat Island Reduction credit. Our project centers around a commercial tower, which is owned by our client. However, the...

VOC Compliance for Toilet pods manufactured offsite

NC-v4 EQc2: Low-emitting materials
posted by Alokmay Behera on Oct 4, 2023, 2:28 am

There is a mixed-type building targeting LEED Platinum based in UAE. The project will have all toilet pods constructed offsite. If we go by the LEED V4 reference guide, any offsite application...

Last reply: Alokmay Behera, Oct 9, 2023, 7:27 am

No Exterior Lighting Query

EBOM-v4.1 SSc3: Light Pollution Reduction
posted by Wafa Arif on Oct 2, 2023, 7:51 am

We have a high-rise building for which we are pursing LEED...

Last reply: Bill Swanson, Oct 5, 2023, 9:42 am

CO Sensors for every Residential Unit as per Minimum IAQ Performance

NC-v4 EQp1: Minimum indoor air quality performance
posted by Alokmay Behera on Aug 10, 2023, 1:36 am

In one of our Projects with residential spaces, we are required to provided CO sensors for every residential unit. This is a mandatory requirement under the pre-requisite. The same was confirmed...

Last reply: Alokmay Behera, Aug 11, 2023, 1:12 am

PRIVATE SHUTTLE FOR A FACTORY LOCATED IN A UPCOMING INDUSTRIAL DEVELOPMENT WITH NON-EXISTANT PUBLIC TRANSPORTATION

NC-v4.1 LTc5: Access to quality transit
posted by Amal Venugopal on Jul 27, 2022, 5:13 am

The BD+C, NC project we are applying for is a factory with manufacturing unit and office spaces, located in an developing industrial  area with no mutimodel transportation facilities . The...

Last reply: Umesh Atre, Aug 2, 2023, 4:16 pm

Minimum Indoor Air Quality Performance Calculation

NC-2009 IEQp1: Minimum indoor air quality performance
posted by Amal Venugopal on Jul 4, 2017, 7:27 am

My Project is Having one FAHU on roof which is supplying treated Fresh air to all...

Last reply: Andrey Kuznetsov, Apr 29, 2023, 4:16 pm

Data Sheet or Laboratory test report?

NC-v4 SSc5: Heat Island Reduction
posted by Samer Alhmdan on Jul 20, 2017, 8:46 am

Hello,

Do we need a laboratory test report to substantiate the...

Last reply: emily reese moody, Feb 9, 2023, 1:17 am