Topic | Recent |
---|---|
CO Sensors for every Residential Unit as per Minimum IAQ PerformanceNC-v4 EQp1: Minimum indoor air quality performanceposted by Alokmay Behera on Aug 10, 2023, 1:36 am
In one of our Projects with residential spaces, we are required to provided CO sensors for every residential unit. This is a mandatory requirement under the pre-requisite. The same was confirmed... Last reply: Alokmay Behera, Aug 11, 2023, 1:12 am |
|
How do I calculate the total runoff, if I am required to send rainwater elsewhere?EBOM-v4.1 SSc1: Rainwater managementposted by Rick Fox on Aug 10, 2023, 4:13 pm
I have so many questions concerning storm water management. My company is a large warehouse. We have 350 truck parking spots as well as 150 employee parking spots and a 525,000 square foot... |
|
More elaboration on the long-term storageCI-v4.1 LTc4: Bicycle facilitiesposted by CRB Sustainability on Jun 7, 2023, 10:47 am
We are currently certifying under CI 4.1, and I would like to gain a deeper understanding of the requirements for long-term storage of bikes located outside of the building. I came across an... Last reply: Laura strauss, Aug 10, 2023, 1:47 pm |
|
Averaging Facility Rates over TimePilot-Credits MRpc87: Verified Construction & Demolition Recycling Ratesposted by Vanessa Hostick on Aug 10, 2023, 11:11 am
The credit guidance notes that to apply rates over time, a project's waste should be the weighted average for the facility over the time in which the project sent materials to the facility. ... Last reply: Michelle Rosenberger, Aug 10, 2023, 11:43 am |
|
Option 2: Emergency Preparedness Planning Red Cross Form ExamplesPilot-Credits IPpc98: Assessment and planning for resilienceposted by Julia Manion on Aug 9, 2023, 5:50 pm
Does anyone have an example of the American Ready Cross 123 Assessment and Facility Description Forms to preview before attempting this credit??? I would like to determine if those forms are... |
|
OPR & BOD & Design Document reviewNC-v4 EAp1: Fundamental commissioning and verificationposted by Dave Hubka on Sep 30, 2021, 3:28 pm
Fundamental Commissioning requires the... Last reply: Edgar Arevalo, Aug 9, 2023, 7:03 pm |
|
Schedule for Data Center LoadNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Aug 7, 2023, 3:14 pm
Hi I am modeling a Data Center what schedule should I use for IT loads, should I run it for 100% all the time? Last reply: Marcus Sheffer, Aug 9, 2023, 4:37 pm |
|
Renewable Energy ProductionNC-v4 EAp2: Minimum Energy Performanceposted by Piotr Adamczyk on Aug 9, 2023, 2:32 am
Dear All, I want to ask you how you approach taking into account the yield of the photovoltaic installation in the MEPC calculator. Last reply: Marcus Sheffer, Aug 9, 2023, 4:27 pm |
|
Path 3: Proposed building values exceeding 5% in one category.CI-v4.1 MRc2: Interiors life-cycle impact reductionposted by Gaston Michaud on Jul 18, 2023, 1:13 pm
Hi everyone, We have a project that has several design optimizations and is reusing most of the furniture and some walls. The LCA shows the proposed construction with a 20% reduction in... Last reply: Sarah Buffaloe, Aug 8, 2023, 1:55 pm |
|
Baseline Model for Data center EconomizerNC-v4 EAp2: Minimum Energy Performanceposted by Rajat Wadhwa on Aug 8, 2023, 12:36 pm
Hi, I have encountered an issue with the baseline model for Data Center , based on LEED Comments we are using system 8 and for climate zone 5a the economizer shut off limit is 70F, the... Last reply: Moses Chong, Aug 8, 2023, 12:55 pm |