Log in

4026 search results for "zero lot line"

Forum
Topic

LEED ND Innovation/Pilot Credit Library

ND-v4 INc1: Innovation
posted by Matthew VanSweden on Jun 29, 2023, 6:23 pm

It seems there are VERY few Innovation and/or Pilot LEED v4 ND options available. Is this a technical limitation of the online reference guide website or are there really something like eight Pilot credit options and zero established innovation options within the LEED v4 ND Innovation Catalog? Can teams use innovation credits within the v4 BD+C innovation catalog?  INc1 United States ...

Last reply: Eliot Allen, Jun 30, 2023, 1:22 pm

No shower

NC-v4 WEp2: Indoor water use reduction
posted by Ricardo Sá on Oct 3, 2018, 5:07 am

van der Sluys LEEDuser Basic Member 1 thumbs up June 30, 2023- 4:29 am Waht if you project has no shower? Can you enter a line with a shower and then show that the design flow rate is 0 liter per...

Last reply: Dave Hubka, Jun 30, 2023, 10:11 am

Exterior doors/windows in v4.1

NC-v4.1 EQc2: Low-emitting materials
posted by Emily Purcell on Jan 5, 2021, 2:36 pm

Architects LEEDuser Basic Member 32 thumbs up October 5, 2021- 8:38 am Emily- What type of windows were included in your project?  I have a commerical project that has a lot of curtain wall and foil-faced...

Last reply: Jennifer Kruse, Jun 28, 2023, 10:00 am

TOD No Minimum for Parking

NC-v4 LTc7: Reduced parking footprint
posted by Graham Linn on Jun 23, 2023, 8:00 pm

to reduce its parking below that minimum. It does sound a bit stretch-y but it's very much in line with the intent of the credit. There are a lot of posts in this forum asking what to do if the ITE...

Last reply: Graham Linn, Jun 26, 2023, 12:18 pm

Renewable energy

EBOM-v4.1 EAp3: Energy Performance
posted by SAMY Chamy on Jun 23, 2023, 9:16 am

Hi Team, We have received an inquiry from a large corporation with more than 20 buildings on the same campus that has 2.5 MW of solar on its roof and operates with net metering (supplying the Solar PV electricity generation to the grid and using the grid power for the entire campus). Now They plan for LEED EB O&M and LEED zero carbon and energy for one of the buildings on the same campus,...

Creating Baseline building Shell based on ΑSHRAE 90.1-2010- proposed building walls with more than 40% of glass

NC-v4 EAc2: Optimize Energy Performance
posted by Konstantina Kalliakoudi on Jun 16, 2023, 3:52 am

23, 2023- 4:20 am Thank you Marcus, You helped me a lot!!!! Log in or register to post comments ...

Last reply: Konstantina Kalliakoudi, Jun 23, 2023, 4:20 am

Justification of usign the 9.6.2 Additional Power lighting in the Baseline Model

NC-v4.1 EAp2: Minimum Energy Performance
posted by Marc Maso on Jun 19, 2023, 12:22 pm

It appears as if you are applying the correct process in the model. I would provide the additional lighting energy use as a separate line item in the modeling results so that you can demonstrate...

Last reply: Marcus Sheffer, Jun 22, 2023, 10:56 am

Zone Secondary Recirculation Fraction

NC-v4 EQp1: Minimum indoor air quality performance
posted by Dave Hubka on Jun 19, 2023, 9:53 am

units. Based on the mechanical schedules provided in PI Project Information, the terminal units are shut-off VAV boxes (non-fan-powered); therefore, the Er value should be zero or left blank. So I guess Er is zero for non-fan powered boxes. But do not understand the logic. EQp1 ...

No more than 25% of the building’s cool-wall area facing away from the equator

Pilot-Credits SSpc154: Heat Island Mitigation with Cool Walls
posted by Aleksandra Prawda on Oct 8, 2021, 7:22 am

if you could share your experience with me. Thanks a lot! Bests, Hashir Log in or register to post comments Zeynep Cakir LEED AP BD+C, WELL AP, Sustainable Building Consultant ECOBUILD LEEDuser Basic...

Last reply: Zeynep Cakir, Jun 15, 2023, 7:09 am

Monitoring VAV System Airflow Setpoint

NC-v4 EQp1: Minimum indoor air quality performance
posted by J Schütz on May 30, 2022, 5:13 am

2023- 3:49 am I get this question a lot in my projects, what set-point to use? We have 100 % outdoor air, and flow rates according to our code is often a lot higher than ASHRAE. Can we use minimum flow...

Last reply: Maria Porter, Jun 8, 2023, 3:49 am