Log in

3953 search results for "zero lot line"

Forum
Topic

browser compatibility

Navigating LEED Online
posted by emily reese moody on Mar 22, 2017, 7:43 pm

https://leeduser.buildinggreen.com/forum/leed-online-now-leed-line Log in or register to post comments Dee Spiro LEEDuser Basic Member 30 thumbs up May 21, 2021- 3:31 pm Hi Emily and thanks for the information.  I looked up the actual sunset date for IE,...

Last reply: emily reese moody, Jun 14, 2022, 3:47 pm

A call to hit the 'pause' button on LEEDV4..formerly 2012;-)

General forums
posted by Rob Watson on May 24, 2012, 1:44 pm

intends these things, but they won't figure it out without a lot of up front analysis with real projects. Making these things formal via early ballot could become a big black eye, and make them more...

Last reply: Marcus Sheffer, Jun 4, 2012, 5:12 pm

Anyone been through full review of this credit yet?

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Joanna Switzer on Oct 26, 2017, 2:57 pm

products: 1) Dune ceiling panel (Armstrong), 2) LOXON Concrete & Masonry Primer (Sherwin Williams) and 3) ProMar 200 HP Zero VOC Eg-Shel (Sherwin Williams). Does the integrative analysis worksheet must...

Last reply: Mariia Savinska, Aug 4, 2023, 4:04 am

Regulation of commingled recycling facilities

NC-v4 MRc5: Construction and demolition waste management
posted by Keith Winston on Sep 22, 2016, 7:36 pm

you cannot simply have the line item of "commingled" with a diversion rate, unless you are using documented proof of the facility's average rate.  As not all facilities have...

Last reply: RETIRED, Aug 24, 2018, 8:41 am

Breaking News: Ballot postponed to August 15

General forums
posted by Nadav Malin on May 24, 2012, 6:25 pm

And the cumulative field experience with mandatory features such as ASHRAE 90.1-2010 is exactly zero. Log in or register to post comments Christopher Schaffner CEO & Founder The Green Engineer LEEDuser Expert 963...

Last reply: Mara Baum, Jun 1, 2012, 3:26 pm

EA PR 2

General forums
posted by Elizabeth Crenshaw Hammitt on Mar 1, 2012, 1:59 pm

to be completely sure...and yes, for my part, I will not give up in working to ensure that Option 3 is restored. Eyes on the prize: Market Transformation. And here on the front line in the Southeast, where...

Last reply: Marcus Sheffer, Sep 24, 2012, 11:30 am

Option 1 documentation

NC-v4 LTc4: Surrounding density and diverse uses
posted by Sue Bryant on Jun 13, 2017, 1:57 pm

to the calculation on your project? Like, if you open Google maps and draw some 1/4 mile lines from your boundary, does that add a lot of land but no new buildings? If not, I'd contact LEED Coach or customer...

Last reply: Nicole Keeler, Jul 15, 2022, 3:22 pm

LEED AP Credit

General forums
posted by Pete Koszulinski on Nov 8, 2010, 12:43 pm

to the LEED/Sustainability/Green process. I’ve seen a number of projects go through certification and earn that point, while an inexperienced person does the documentation and manages the LEED process. I’ve been giving a lot...

Last reply: William Morrison, Feb 10, 2011, 4:45 pm

"Everything within the waterproofing membrane"

NC-v4.1 EQc2: Low-emitting materials
posted by James Keohane on Jun 24, 2020, 12:14 pm

it's certainly a lot easier to calculate if you don't have to use the budget method AND you can get a bonus point for tracking at 90% for a min. of three categories.  If your project is v4...

Last reply: Adrienne Lynn, Feb 28, 2024, 4:36 pm

Exterior doors/windows in v4.1

NC-v4.1 EQc2: Low-emitting materials
posted by Emily Purcell on Jan 5, 2021, 2:36 pm

Architects LEEDuser Premium Member 31 thumbs up October 5, 2021- 8:38 am Emily- What type of windows were included in your project?  I have a commerical project that has a lot of curtain wall and foil-faced...

Last reply: Jennifer Kruse, Jun 28, 2023, 10:00 am