Medical space types not listed in the Minimum IAQ Performance Calculator

Healthcare-v4 EQp1: Minimum indoor air quality performance
posted by Edgar Arevalo on Oct 18, 2024, 3:16 pm

I am currently working on a LEED v4 Healthcare project, and the Minimum IAQ Performance calculator does not have space types that would be typical for a medical center or hospital.  I feel we can pick a space type from the original list that best matches with the space types in the hospital, but I feel like a lot of the space types in the hospital may not match at all with any of the given spaces types in the calculator. Has anyone had the same issues with their calculators? EQp1 United States ...

Last reply: Cory Duggin, Oct 18, 2024, 3:20 pm

ROhS Directive

Healthcare-v2009 MRc4.2: PBT source reduction - lead, cadmium and copper
posted by Gustavo De las Heras Izquierdo on Feb 27, 2014, 8:32 pm

motherboard to your laptop's screen. Plus, it’s not just an EU thing; a lot of countries have their own RoHS rules now. https://krishnametlab.com/rohs-compliance-testing-certification/ Log in or register...

Last reply: Alok Negi, Oct 18, 2024, 7:16 am

Integrative Analysis-- Lessons Learned: "Additional Installation Materials"

Pilot-Credits MRpc103: Integrative Analysis of Building Materials
posted by Marina Rullo on Jun 25, 2024, 3:19 pm

is that it is useful (if not necessary) to include an additional line at the bottom of the matrix under the "functional unit, lifecycle scope, and supplemental information" section titled "Additional...

Last reply: Jennifer Bowser, Oct 16, 2024, 7:11 pm

Baseline parking for a DATACENTER

NC-v4 LTc7: Reduced parking footprint
posted by Marion THIBAULT on Jun 23, 2020, 12:10 pm

Hi everyone, I'm working on a DATACENTER project, and I can't find the baseline parking capacity for this type of building. It is not included in the "TABLE 1- Base Ratios for parking spaces, by building type." neither in the "Institute of Transportation Engineers’ Transportation Planning Handbook, 4th edition, Table 11-12."? Which of these 2 document references should be used? And for a DATA CENTER which type of building do I have to use? Warehouse? Industrial park? Other? Thanks a lot for your answers. Marion LTc7 France ...

Last reply: Gioia Connell, Oct 16, 2024, 12:34 pm

Campus Approach

NC-v4 LTc7: Reduced parking footprint
posted by Ricardo Sá on Sep 2, 2020, 12:46 pm

boundary?"  Do you mean the entire campus boundary, which is in line with the reference guide, or do you imply LEED project boundary?  Just wondering.  Thank you in advance for your help. Log in or register...

Last reply: Jose Castorena, Oct 16, 2024, 10:39 am

Multiple Cx Agents for the Option Paths

NC-v4 EAc1: Enhanced Commissioning
posted by Saagar Patel on Feb 25, 2020, 9:52 am

I do commissioning and I work at a design firm.  When a customer pursues both Fundamental and Enhanced cx- my group would not be able to do the Cx of the project.  However, we believe there is a lot of value in doing MBCx for our customers as well as for to confirm the performance of our design.   Is it possible to to have a independent third party perform the tasks for fundamental and enhanced cx, but have our team perform MBCx services?  If so, what would be the proper mechanism to do that ie: owner has the contact for MBCx or we are sub to the cx agent?   EAc1 ...

Last reply: Joyce Kelly, Oct 8, 2024, 8:57 am

Can decorative lighting be excluded from interior lighting requirements?

NC-v4.1 EQc6: Interior lighting
posted by Sara BENLOUBA on Nov 23, 2023, 8:36 am

Basic Member 13 thumbs up November 27, 2023- 9:03 am Dear glenn Heinmiller,  Thanks a lot. Your opinion is very clear.  Suppliers say it hard to find luminaires with CRI>90 that can be integrated...

Last reply: Andrey Kuznetsov, Oct 4, 2024, 11:30 pm

Ordinance says no new minimum parking needed for Parks

NC-v4 LTc7: Reduced parking footprint
posted by Akshaya Bhaskar on Oct 4, 2024, 11:39 am

We are currently working on a 4000 sq ft park shelter project located in an existing park in Madison, Wisconsin. The local ordinance states that parks and playgrounds do not have a minimum parking requirement. There is an existing parking lot associated with the site. we are not adding or reducing any parking. Would we still meet the the reduced parking credit requirement if we do not add any reserve car pool spots in the parking lot as we are not doing any work in that area? Thank you in advance  LTc7 U.S. and Canada ...

Input of Solar Energy in ARC

EBOM-v4.1 EAp3: Energy Performance
posted by Pulak Goyal on Oct 1, 2024, 6:30 am

I have a whole building going for LEED EBOM v4.1 certification. The owner uses onsite generated renewable energy besides the energy from the grid. Out of the total renewable energy production, most of it is used by the owner, and the rest is exported. Out of the used energy, a lot of it is also sold as RECs. I have input the energy sold as RECs as "purchased from grid", and the remaining energy (after excluding the exported energy also) is input as "generated onsite solar".  Is this the right way to enter this into ARC? EAp3 South America ...

Materials reuse cost of zero

CI-v4.1 MRc4: Sourcing of Raw Materials
posted by Emily Deydier on Sep 26, 2024, 7:54 pm

of 160% for the sustainable criteria value in the summary, which seems like a lot! Thank you all for your help, Emily MRc4 ...