Can I obtain the Access to Quality Transit in multiple buildings sharing a main controlled entrance?NC-v4.1 LTc5: Access to quality transitposted by Zabdi Valdez on Mar 14, 2023, 6:01 pm
I'm working with an industrial park with multiple buildings (5) individually certified which has two bus stops located within 1/4 mile of the main entrance and enough bus trips. The park has an... |
|
Plug loads for server roomsNC-2009 EAp2: Minimum Energy Performanceposted by MARCIO OROFINO on Apr 22, 2015, 4:39 pm
Hi. Last reply: Jean Marais, Mar 14, 2023, 4:39 am |
|
Site with no existing greenfieldCS-v4 SSc2: Site development - protect or restore habitatposted by Agustin Bertolotti on Mar 9, 2023, 9:01 am
Hi everyone We are working on a site which is previously developed with no existing... |
|
DIVERSE USE IN A ISLAND RESORT DEVELOPMENTHospitality-NC-v4 LTc4: Surrounding density and diverse usesposted by Amal Venugopal on Jan 27, 2023, 8:00 am
We are working on a large scale resort development project which is situated on an natural island . The project has more than 8 diverse uses within its boundary. But beyond that there are uses in... Last reply: Amal Venugopal, Jan 31, 2023, 2:50 am |
|
PRESENCE OF WATERPilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environmentposted by Ingrid Muñoz on Jan 17, 2023, 7:36 pm
Hello, we are pursuing the Designing with Nature, Biophilic Design for the Indoor Environment pilot credit for an interior commercial. Is it possible to use the following strategy as part of... |
|
Imported material with EPDNC-v4.1 MRc2: Environmental Product Declarationsposted by Gustavo De las Heras Izquierdo on Jan 13, 2023, 12:56 pm
Hello, We have received the following review comment:
|
|
No-irrigation documentationNC-v4 WEp1: Outdoor water use reductionposted by Alexia Anastassiadis on Dec 12, 2022, 6:22 am
Hi all, |
|
Option 1- what is the minimum number of cyclesNC-v4.1 WEc3: Optimize Process Water Useposted by Gustavo De las Heras Izquierdo on Nov 30, 2022, 3:08 pm
Hello, Let's say that my project has a bad quality of potable water, and the concentration levels are the same as Table 2. Therefore, the maximum number of cycles would be "1 cycle". ... |
|
Opening an Anticipated creditLEED Reviews: Appeals, Design/Construction Submittals, and moreposted by Victoria Rios Esteve on Nov 25, 2022, 1:29 pm
Hi! We are working on a LEED v2009 Core and Shell certification. We are about to upload Construction Submittal's documentation. But we need to update some prerequisites and credits that were... Last reply: Marcus Sheffer, Nov 26, 2022, 3:03 pm |
|
Hotel Resort- multiple blocks as a "single building"Hospitality-NC-v4 MPR3: Must comply with project size requirementsposted by ARES on Nov 25, 2022, 2:36 pm
Our project is a Hotel Resort, consisting of the main admin building, apartment blocks, individual villas, spa blocks, utility blocks, restaurants, multipurpose buildings, etc. According... Last reply: steven Leonardo, Nov 26, 2022, 5:49 am |