I have a whole building going for LEED EBOM v4.1 certification.

The owner uses onsite generated renewable energy besides the energy from the grid.

Out of the total renewable energy production, most of it is used by the owner, and the rest is exported.

Out of the used energy, a lot of it is also sold as RECs.

I have input the energy sold as RECs as "purchased from grid", and the remaining energy (after excluding the exported energy also) is input as "generated onsite solar". 

Is this the right way to enter this into ARC?