4026 search results for "zero lot line"
Topic | Recent |
---|---|
The Thermal Environment Credit Category Needs AttentionLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Chris Mackey on May 18, 2024, 3:45 pmThe latest versions of ASHRAE-55 have a lot of guidance on how to implement these effectively. Furthermore, there really needs to be a requirement to simulate indoor radiant temperatures in order to comply... |
|
Sound Environment and Occupant ExperienceLEED v5 BD+C/ID+C: Indoor Environmental Quality Public Commentsposted by Projetos Giner on May 17, 2024, 11:04 amare ignored carries a lot of weight. The optional LEED acoustic credits in v4 are more difficult to navigate and achieve but these could have been improved and clarified rather than totally replacing them... Last reply: Chris Mackey, May 18, 2024, 3:34 pm |
|
LEED v5 BD+C/ID+C Water Efficiency public commentsLEED v5 BD+C/ID+C: Water Efficiency Public Commentsposted by Nadav Malin on Apr 3, 2024, 6:24 amand leak detection requirements for products installed. For example does the leak detection sensor data in real time vs user interface? Current closed by water vs Pressure loss over time in static line? Does it have detect general vicinity of leak is vs just somewhere in the plumbing line? For example water metering an estimated amount based on activations and time duration vs. measured consumption Log... Last reply: rose gicheru, May 16, 2024, 1:07 pm |
|
Surprised Triple Bottom Line Analysis isn't hereLEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Commentsposted by simon fowell on May 16, 2024, 10:36 amI think the Triple Bottom Line assessment (i.e. quantifying the value/impact of the design) would be beneficial in this category for 3 reasosn: Alignment with USGBC's Strategic Plan: Placing the ESG-Informed Design credit within the Integrative Process category would better align with the USGBC's strategic objectives, fostering a more cohesive approach to sustainability in building design and construction. Empowerment of Design Teams: By incorporating the ESG-Informed Design credit into the Integrative Process category, design teams would be equipped with the tools necessary to address first-cost... |
|
Natural Ventilation in Dwelling Units | ASHRAE 62.1- 2010 natural ventilation exceptionsNC-v4 EQp1: Minimum indoor air quality performanceposted by Aris Koliopoulos on Jan 27, 2022, 2:36 amto ventilation rates from 62.1 (Table 6.1, min OAR for dwelling units)? Is there an official guidance from GBCI that we can use 62.2 instead of 62.1? Thanks a lot (this is pretty urgent...) Kind regards, Anne Log... Last reply: Santiago Avila, May 15, 2024, 10:02 am |
|
v5 BD&C: Project Priorities and the Triple Bottom LineLEED v5 BD+C/ID+C: Project Priorities and Innovation Public Commentsposted by Stephane Larocque on May 14, 2024, 9:27 amI suggest that the current pilot credits for triple bottom line analysis i.e. "Informing Design Using Triple Bottom Line Analysis" and “Informing Design by Major Credit Category Using Triple Bottom Line Analysis” become a full permanent credit that can be used to achieve points under Project Priorities. There are hundreds of examples of the credits being used and a great deal... |
|
Regularly occupied area of an hotel roomNC-v4 EQc7: Daylightposted by Ilse Dijkstra-Nugteren on Apr 5, 2016, 6:34 amwith precise description and layouts clearly showing the "border line" that separates excluded part and shows the left area ind it's sqm/sqf. Log in or register to post comments Deborah Lucking... Last reply: Deborah Lucking, May 13, 2024, 11:38 am |
|
Problems with v4v4 1_Indoor Water Use Reduction Calculator_v05.1.xlsmSchools-NC-v4 WEp2: Indoor water use reductionposted by Alexia Anastassiadis on Jan 4, 2024, 4:10 pmemily reese moody Sustainability Director, Certifications & Compliance Jacobs LEEDuser Expert 475 thumbs up May 11, 2024- 5:23 pm Hi Alexia, Can you provide some more info on which lines in the form and tabs you're trying to change? If your user groups are already separate tabs, you shouldn't need to adjust any uses per day- the calculator already knows what they expect/want to be used for frequency. Log in or register to post comments ... Last reply: emily reese moody, May 11, 2024, 5:23 pm |
|
Completed fit out by owner for rentable office building- not known future tenantsLEED Rating System Selectionposted by ANGELIKI ANTONIOU on Jul 4, 2023, 9:29 amAndrey Kuznetsov ESG consultant, LEED AP BD+C Self Employed LEEDuser Basic Member 33 thumbs up May 10, 2024- 5:40 am I think- no, since it would be a lot of problems, which solving would "cost" relativly high. For instance:-- At constrution review at least 60 % of the project’s gross floor area must be complete- i think it would be impossible in your case since this "completeness" includes fit-out. -- You need to provide energy modelling "as build" including HVAC equipment that must be installed at tennant zones.-- At WE prerequisite you also need to include... Last reply: Andrey Kuznetsov, May 10, 2024, 5:40 am |
|
Rating System Selection [ID+C or BD+C]LEED Rating System Selectionposted by Amgad Khattab on Aug 16, 2023, 6:15 amAndrey Kuznetsov ESG consultant, LEED AP BD+C Self Employed LEEDuser Basic Member 33 thumbs up May 9, 2024- 6:22 pm Clearly ID+C based on the fact that a lot of oportunities to gain some prerequisites of BD+C for 99,99 % are lost, for instance: Construction Activity Pollution Prevention, Environmental Site Assessment, Fundamental Commissioning, Integrative Project Planning and Design. It's better to check also prerequisites of ID+C. Log in or register to post comments ... Last reply: Andrey Kuznetsov, May 9, 2024, 6:22 pm |