We have a project with the following description:
- the building is 10 floors and the owner renting the whole building.
- The Building envelope construction is complete.
- Basements are shared and fully finished by the developer.
- One connection for CHW from the district cooling plant.
- One connection for the power supply.
Shall we target LEED V4 ID+C or BD+C?