Shell Only Assessment- Compliance with ASHRAE 90.1 Mandatory ProvisionsCS-v4.1 EAp2: Minimum Energy Performanceposted by Finance Team on Sep 3, 2024, 12:34 pm
Hi everyone, I hope you're all doing well. As a newly certified LEED BD+C AP, I have a few questions regarding a project we are currently working on and i would appreciate your assistance... Last reply: Finance Team, Sep 11, 2024, 2:32 am |
|
Shell Only Assessment- Compliance with IEQp1 / ASHRAE 60.1 2016CS-v4.1 EQp1: Minimum indoor air quality performanceposted by Christos Kollias on Sep 5, 2024, 3:50 am
Hi everyone, I hope you're all doing well. As a newly certified LEED BD+C AP, I have a few questions regarding a project we're currently working on, and I would appreciate your input.... Last reply: Finance Team, Sep 10, 2024, 2:38 am |
|
Natural Ventilation in Dwelling Units | ASHRAE 62.1- 2010 natural ventilation exceptionsNC-v4 EQp1: Minimum indoor air quality performanceposted by Aris Koliopoulos on Jan 27, 2022, 2:36 am
Dear All, We are working on a 6 storey residential project which pursues LEED certification under the BD+C: New Construction rating system. According to the concept design, dwelling... Last reply: Santiago Avila, May 15, 2024, 10:02 am |
|
LT-Bicycle FacilitiesNC-v4 LTc6: Bicycle facilitiesposted by Tatevik Markosyan on Oct 6, 2023, 9:34 am
Our project is situated in Athens, Greece, where the neighborhood lacks a dedicated... Last reply: Bruno Roque, Feb 23, 2024, 10:43 am |
|
Natural Ventilation Modelling and Credit for savingsNC-v4.1 EAp2: Minimum Energy Performanceposted by Luis Andrade on Apr 11, 2023, 1:31 pm
Hi all, I've been searching around the LEED V2009, V4 and V4.1 EAp2 / c2 versions trying to find an answer to this problem, but I've encountered little information on how to model natural... Last reply: Tyler Thumma, Sep 29, 2023, 8:39 am |
|
Baseline Projects with Several Physically Distinct StructuresHospitality-NC-v4 EAp2: Minimum Energy Performanceposted by MICHAIL MENTZOS on Sep 18, 2023, 3:37 am
We are currently working on a project which has a total area of about 4,000m2. The project consist of several buildings, each of them is no more than... Last reply: Marcus Sheffer, Sep 22, 2023, 11:29 am |
|
Baseline for Projects with Several Physically Distinct StructuresNC-v4 MPR3: Must comply with project size requirementsposted by Mike Mentzos on Sep 15, 2023, 6:57 am
All, We are currently working on a hotel project, which consists from several buildings the sum of them is about 4,000 square meters. Each individual bulding is not greater than 2,300... |
|
Warehouse Ventilation- FiltrationWarehouses-NC-v4.1 EQc1: Enhanced indoor air quality strategiesposted by Ioanna Margariti on Mar 6, 2023, 5:43 am
Hello all, In a project of ours, we have a warehouse with office spaces. According to the Reference Guide, the warehouse area is considered a regularly occupied space that requires fresh... |
|
How to calculate co-drivers in vehicle or motorbike that another one is driving.EBOM-v4 LTc1: Alternative Transportationposted by MAGDALINI AL-FANTEL on Mar 9, 2022, 10:32 am
Hello, In the frame of LTc1 - Alternative transportation we have conducted a survey in order to see how the regular occupants commute to and from the project premises. As one of the... |
|
Campus project- District heating/coolingNC-2009 EAp2: Minimum Energy Performanceposted by Nikos Tsitsikas on Sep 29, 2020, 2:41 pm
Hi all, We are working on a campus project that includes two separate buildings and a mastersite. Both buildings would be served by boilers and chillers that are located in the basement of... Last reply: Marcus Sheffer, Oct 5, 2020, 2:16 pm |