Log in
Forum » Netherlands
Topic

Shower Requirement- More than 50% Occupants with Bike Space

CI-v4 LTc4: Bicycle facilities
posted by Oliver Bate on Oct 16, 2017, 11:51 am

Hi,

I have a project in Holland which provides 2700+ bike storage spaces for 5000 occupants which clearly meets the intent of the credit as all other requirements are met e.g. Bike...

Last reply: Stephen van der Sluys, Jul 10, 2023, 7:10 am

Cooling tower (no refrigerants) and some small units (with gwp > 10)

NC-v4 EAc6: Enhanced Refrigerant Management
posted by Janine van den Kerkhof on Jan 30, 2023, 4:55 am

Hi all, 

Can we include the capacity of the cooling towers in the weighted average calculation? This will cover most of the cooling in our building. However we do need to include some...

EAc7- Since when it's neccessary the RECs/Carbon offsets

CS-v4 EAc7: Green power and carbon offsets
posted by Instra Ingenieros on Mar 22, 2022, 11:49 am

Hi everyone, hope anyone can help me with this issue.

I'm trying to meet this credit purchasing both RECs and Carbon Offsets for both electric and carbon consumptions. It is clear that we...

Last reply: Aparna Pradeep Kumar, Sep 5, 2022, 4:57 am

Bikeshare requirements

NC-v4.1 LTc6: Bicycle facilities
posted by Maria sAra Di maggio on Apr 29, 2019, 6:17 am

Hi,

How many shared bicycle stations need to be implemented in order to reduce the long term and short term bicycle facilities by 50%?

Regards

Maria

...

Last reply: Dave Hubka, Apr 11, 2021, 3:08 pm

Future renewable energy within the leed border

CS-v4 EAc5: Renewable energy production
posted by Instra Ingenieros on Sep 30, 2019, 11:31 am

Hi!

We have a project that the owner want to deliver the LEED documentation at the end of 2019. The project will have an a huge quantity of photovoltaic energy in the roofs of the...

Last reply: Instra Ingenieros, Jun 3, 2020, 9:27 am

Reduced parking Footprint

NC-v4.1 LTc7: Reduced parking footprint
posted by Maria sAra Di maggio on May 7, 2019, 6:32 am

Hi!

Are on-street car parking spots belonging to the project owner counted towards the final car parking capacity in LEED Version V4.1?

Last reply: Rodolfo Loro, Jr., Mar 18, 2020, 8:24 am

LEED project with laboratoria

LEED Rating System Selection
posted by Ydo Schuuring on Nov 14, 2019, 7:49 am

Hello,

For a possible LEED v4.1 new construction project I need to determine which LEED scope is applicable. The project contains of offices and Laboratories.

I can't find...

Last reply: David Posada, Nov 14, 2019, 8:45 pm

Acoustic Performance Credit for Hospitals

Healthcare-v4 EQc9: Acoustic performance
posted by Valentina Balbis on Nov 27, 2018, 11:43 am

Hello LEEDuser community,
I’m working on a project for a hospital, in the Netherlands Antilles.
The acoustic performance credit refers to the American standards 2010 FGI Guidelines...

lengths of the permanent entryway systems

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ydo Schuuring on Aug 21, 2017, 10:30 am

LEED v4 describes to install a permanent entryway systems at least 10 feet (3 meters) long in the primary direction of travel, to capture dirt and particulates entering the building at regularly...

Last reply: Emily Neal, Jul 19, 2018, 3:30 pm

defination occupied spaces vs. ASHRAE 2011 handbook

NC-v4 EQc9: Acoustic performance
posted by Ydo Schuuring on Nov 20, 2017, 2:14 am

dear all,

Credit IEQc9 requires that all occupied spaces should meet the requirements of HVAC background noise and refers to 2011 ASHRAE handbook, chapter 48, table 1. This table gives the...

Last reply: Levan Natadze, Feb 16, 2018, 6:56 am