Reclaimed land

NC-v4 LTc2:Sensitive land protection
posted by  Nermin Hegazy  on 

What is LEEDs take on reclaimed land that has not been previously developed?

2
Lead Building Performance Analyst
Page
LEEDuser Premium Member
0 thumbs up
Thu Apr 4, 2024, 10:19 pm

Habitat / endangered species range

NC-v4 LTc2:Sensitive land protection
posted by  Jorge Lopez de Obeso  on 

I have made the corresponding search to corroborate that my project is not within a sensitive land.

0

Green field but planned for development in an industrial zone

NC-v4 LTc2:Sensitive land protection
posted by  Thomas Tan  on 

Dear All,

I have a project which will be built on a lot located in a industrial zone. The lot is used to be natural land but filled up with sand now.

2
Director of Sustainability
NORR
LEEDuser Expert
7 thumbs up
Mon Nov 16, 2020, 4:09 am

Waterbody and Wetland Definition

NC-v4 LTc2:Sensitive land protection
posted by  Senna Sabir  on 

Hi everyone - just reviewing the credit definitions again for our coastal development.

2
Director of Sustainability
NORR
LEEDuser Expert
7 thumbs up
Tue Jul 28, 2020, 2:03 pm

Previously Developed - Golf course

NC-v4 LTc2:Sensitive land protection
posted by  PJ Ryan  on 

Hi,

I'm working on the LEED certification of a development located on land formerly used as a golf course.

Would this be considerd to be 'previously developed'?

1
Wed May 6, 2020, 3:35 pm

exceptions for farmland?

NC-v4 LTc2:Sensitive land protection
posted by  Erica Downs  on 

We have an infill site on a university campus.  Unfortunately, this particular plot of land was previously undeveloped.  When checking the soils survey site, a portion of the site comes u

2
Director of Sustainability
NORR
LEEDuser Expert
7 thumbs up
Thu Aug 15, 2019, 6:02 pm

minor improvements within the water body body buffers: grade changes necessary to ensure public access

NC-v4 LTc2:Sensitive land protection
posted by  Louise Schlatter  on 

Hi.  I have a question about minor improvements within the water body body buffer.  It says "grade changes necessary to ensure public access."  We have a small First Order strea

3
Fri Aug 9, 2019, 2:15 pm

LT CREDIT: SENSITIVE LAND PROTECTION -Developed land within <100 ft from waterbodies

NC-v4 LTc2:Sensitive land protection
posted by  Ricardo Filho  on 

Hello, do these 2 rules:

Water bodies. Areas on or within 100 feet (30 meters) of a water body, except for minor improvements.

3
Thu Mar 14, 2019, 6:01 pm

Airports and LTc2

NC-v4 LTc2:Sensitive land protection
posted by  Konstantina Kalliakoudi  on 

Hello to all,

I have an airport which will be located in a place were today there are olive groves and vineyards land.

1
Mon Oct 29, 2018, 12:55 pm

Greenfield with Underground Utilities

NC-v4 LTc2:Sensitive land protection
posted by  Cathal Heneghan  on 

Hi all

My project is a green field site apart from utility services (water and electric) which run underground through a portion of the site for neighbouring buildings.

1
Fri Sep 7, 2018, 11:10 pm

Does a remediated Ash basin qualify for LTc2...?!

NC-v4 LTc2:Sensitive land protection
posted by  Olawale Taiwo  on 

My project is sited on a land mass which happens to be a remediated ash basin site on a facility which is now being transformed into a gas powered plant ( from a coal plant) and has now transformed

2
Director of Sustainability
NORR
LEEDuser Expert
7 thumbs up
Thu Aug 9, 2018, 1:42 pm

Site vegetated when project started; however it was previously developed

NC-v4 LTc2:Sensitive land protection
posted by  Helen Kessler  on 

Our v4 project is on a site that previously had a housing development.  This development was removed some time ago and the land now has grass and trees.  We would like to say it was previ

1
Wed Aug 8, 2018, 6:54 pm

Distance from water bodies and wet lands

NC-v4 LTc2:Sensitive land protection
posted by  Bazeeth Ahamed K M  on 

In V3, the development boundary from water bodies and wetlands should be 50' and 100' respectively. Why in V4 it is reversed ie 100' for water bodies and 50' for wetland? Any justification?

1
Fri Nov 8, 2013, 9:31 pm

Allowed minor improvents

NC-v4 LTc2:Sensitive land protection
posted by  soha yamani  on 

what the word clearings mean in the allowed minor improvement section for water bodies and wetlands ?

1
Mon Jan 2, 2017, 1:47 pm

Previously Developed AND Wetlands

NC-v4 LTc2:Sensitive land protection
posted by  Becky Johnson  on 

My building is being constructed on previously developed land, however there is a strip of jurisdictional wetlands on site that we are relocating.

1
Thu Mar 3, 2016, 8:37 pm

Platted Lots by Government

NC-v4 LTc2:Sensitive land protection
posted by  soha yamani  on 

Dear All, If a project lies on a platted plot specified by government (surrounded by streets from four or three sides ) in a desert land : is this considered previously developed plot ?

3
Senior Sustainability Engineer
Metec Consultants
LEEDuser Basic Member
12 thumbs up
Mon Jan 23, 2017, 8:16 pm

NC-v4 LTc2: Sensitive land protection/Wetland Protection

NC-v4 LTc2:Sensitive land protection
posted by  Robyn Dowsey  on 

Is there a precedent anywhere for getting this credit with wetland mitigation plan where small inactive wetlands were included in the project footprint but an equal or greater wetland area was purc

2
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Fri Mar 11, 2016, 3:05 pm