Skip to main content

Log in

Loading...
Important: If you have accounts on both BuildingGreen.com and LEEDuser.com with the same email address, use your BuildingGreen password.

Forgot password?

Log in

Sign in to your LEEDuser account

This feature available to logged-in users only.

Log in to your account »
Sign up for a free Basic Membership »

Firm or campus member?

Please log in using your personal profile:
Log in »   Create personal profile »

How can we serve you better?

Sign in to use the forum

Forum access is included with all levels of LEEDuser membership (basic and premium).

Log in now OR
Create a free basic membership

Not a member yet? LEEDuser Premium membership gives you access to all credit tips, checklists, documentation samples, and more.

  • Monthly premium membership (auto-renews): Get it now for /month.
  • Annual premium membership (auto-renews): Get it now for /year.
  • Basic membership: Sign up for free.
Home Go to BuildingGreen.com
  • Forum
  • LEED credits
  • Tip Sheets
  • Blog
  • About
  • CEUs
  • Pricing
  • Exam Prep
  • Reports
  • FAQ
  • Support
  • Log in
Home
  • LEED Credits
  • Forum
  • Blog
  • Tip sheets
  • Search form

Log in

Search form

Forum discussion

NC-v4 LTc2: Sensitive land protection

See LEEDuser’s guidance on NC-v4 LTc2 »

Are historical sites established prior to the existence of floodplain maps still subject to floodplain compliance?

Project location: United States

May 10, 2023

Lawrence Rennell
Rennell Associates, LLC
LEEDuser Premium Member

2 thumbs up

Project location: United States

May 10, 2023

Post a reply

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for  »
Emily Purcell's picture
Emily Purcell
Sustainable Design Lead
CannonDesign

LEEDuser Expert

378 thumbs up

May 10, 2023 - 6:20 pm

The floodplain requirement is only triggered for land that is not previously developed, so if your site was historically developed it would meet option 1 and none of the additional items under option 2 would apply. 

If it's undeveloped land...I would think the floodplain compliance is still required. The flood map is just a tool that tells you the risk, which existed prior to the map being made, and the intent is to avoid high-risk land. 

  • Log in or register to post comments
Afogreen Build's picture
Afogreen Build
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member

248 thumbs up

July 4, 2024 - 5:55 am

Hi Lawrence,

If the entire site has been previously developed, then the project has met the requirements of Option 1, and no further action is necessary, as stated in the LEED BD+C v4 guide, page 65, step 2.

Best regards – Afogreen Build Team

  • Log in or register to post comments

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.

See all forum discussions about NC-v4 LTc2
Subscribe to new posts about NC-v4 LTc2
Post a new question about NC-v4 LTc2
See LEEDuser’s guidance on NC-v4 LTc2 »
FAQs about LTc2:

If we pursue Option 1 do we have to honor the water body buffer of 100 feet and the flood hazard zones?

When it comes to satisfying the requirements for Option 1, what does the "total buildable land" take into account? And the "total building area"?

Where do we measure the radius from? In LEED 2009, we measured it from the main entry, but the LEED v4 language is different.

How is “previously developed land” defined by LEED?

For an international project, what if a local equivalent for identifying sensitive habitat cannot be determined?

View answers »

  • Contact us
  • BuildingGreen
  • Jobs at BuildingGreen
  • Terms & Conditions
  • Privacy Policy

© 2024 BuildingGreen, Inc. All rights reserved except where noted.

Feedback