Forum quick links
Air-Cooled Chiller Efficiency Compliance with ASHRAE 90.1-2016 and LEED v4.1
NC-v4.1 EAp2:Minimum Energy Performanceposted by Amgad Khattab on
We are working on a project pursuing LEED v4.1 certification using the Appendix G Performance Path.
Rainwater management
NC-v4 SSc4:Rainwater managementposted by Ahmed Hamed on
how to Calculate runoff volume to be managed on site giving rainfall data?
High priority site
NC-v4 LTc3:High priority siteposted by Ahmed Hamed on
- How to apply Priority Designation option outside the U.S
Baseline for unconditioned building
NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
we have a dormitory building with mechanical ventilation (treated with cooling to reach 20 C and a CAV reheat terminal ) only associated with ceiling fans, shall we model the baseline with no
Water Calcultion for Commerical ID+C project
CI-v4 WEc1:Indoor water use reductionposted by Amgad Khattab on
We have a project with the following :
- Tenet space has not any WC [Toilets] in the tenet space. but they are using the WC in the core area.
Hint:
Rating System Selection [ID+C or BD+C]
posted by Amgad Khattab on
We have a project with the following description:
- the building is 10 floors and the owner renting the whole building.
- The Building envelope construction is complete.
core and shell data center
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Amgad Khattab on
Hi everyone,
Option 2 :Only CO2 sensors
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Dina El-Sady on
The project is totally mechanically ventilated .I am choosing adding CO2 sensors in dense areas for option 2 for additional points .What should be done in other small spaces ?Can we only add CO2 se
Preparing concept HVAC requirements
NC-v4 EAc2:Optimize energy performanceposted by Dina El-Sady on
Is it a must to start a simple box energy model for a new project to extract HVAC requirements to acheive a certain level of energy savings?