Forum quick links
Forum
Topic
Replies
Recent
2
Mon Jul 15, 2019, 2:40 am
LESS rating levels : Design Review -Construction Review
LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by saif eddine majdaoui on
Hello
Can we ask for fewer design credits at the construction review stage?
1
Mon Jul 15, 2019, 3:45 pm
Light Pollution Reduction for Multiple buildings
NC-v4 SSc6:Light pollution reductionposted by Amal Venugopal on
Hi,
1
Fri Jul 19, 2019, 3:57 pm
LEED V4 BD+C vs ID+C
LEED Rating System Selection
posted by Tracy Marquis on
We are renovating approximately 13,000 SF (with is about 50% of the first floor) of a 177,000 SF building. The renovation includes interior square footage as well as some major envelope work
5
Fri Jul 12, 2019, 6:48 pm
Side Lighting - Clerestory
NC-2009 EAp2:Minimum Energy Performanceposted by Fatou Jabbie, | Technology | Design and Engineering Plan Reviews | Energy Code Compliance | Sustainability | LEED AP BD+C on
Hello everyone, happy Friday!
2
Fri Jul 12, 2019, 6:06 pm
Are Vision Strips Included in Low-Emitting Materials?
CI-v4 EQc2:Low emitting materialsposted by Diana Smiciklas on
Can 3M vision strips be excluded from the low-emitting materials calculations?
1
Tue Jul 23, 2019, 7:55 pm
LEED Interpretation ID# 10421 for ASHRAE 90.1-2010 Adjusted Point Scale for LEED v2009 Projects
CS-2009 EAc1:Optimize Energy Performanceposted by Silvia Ruiz on
Hi,
2
Fri Jul 12, 2019, 4:45 pm
Following Strategy A but no D for regularly occupied space
NC-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I'm working on a project, where indirect overhead lighting for a regularly occupied space (garbage truck maintenance garage space) would not be feasible due to height restrictions for vehicle
0
1
Mon Jul 15, 2019, 10:09 pm