I have a project that is getting built in two phases on a LEED Campus. The first phase includes the construction of a new 3-8 grade building. Phase 2 will consist of demo of two smaller buildings with the replacement of a new larger building for K-2 grades and a library. The project boundary as it is set right now includes an existing administrative building, a new cafeteria addition, and a parking lot servicing all the buildings including a gym (set outside of the LEED Campus boundary). There is also an access road that connects the parking lot and street on the south side of the project with a street to the north side of campus. 

To fill out the Building Specific Project Information Form 2:

  • Do I use the footprint of all my buildings (existing and new) within the LEED Campus boundary?
  • Because I am submitting my Phase 1 building, do I use the existing buildings square footage scheduled for demolition or the planned new Phase 2 building square footage?
  • Do I include the paved access road connecting the streets to the North and South in my parking area square footage?
  • Does my hardscape square footage include the hardscape of Phase 1 or the final hardscape after the end of completion of phase 2?