Forum quick links
Basic Amenities Within the Main Building
CI-2009 SSc2:Development Density and Community Connectivityposted by Aswin M on
We have a Retail Commercial Interior project inside a Main building. The Main building has many amenities such as restaurant,library, departmental stores, beauty salon, etc,.
Pre development conditions for v4
NC-v4 SSc4:Rainwater managementposted by Gabriela Mesquita on
Good morning,
How to calculate 5% of the site’s vegetated area (excluding preserved or restored habitat area)?
Pilot-Credits SSpc82:Local food productionposted by Adriana Hansen on
Hi everyone, as my team was studying the Local food production requirements, there was a doubt about how to address to the BD+C area requirement below:
PV Panles over compliant white membrane with a high SRI
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Guillermo Hernandez Espinoza on
Hi Everyone.
TVOC and CO2 Testing Recommendations for Arc
posted by Ece Ersoz on
Hi,
Measurements for CO2 / TVOC
Hospitality-EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Denaye Hinds on
Where should these measurements be taken throughout the property/building and how many per zone are required?
TRACE 700 Performance Report - Optimal
NC-v4 EAp2:Minimum energy performanceposted by Mark Norris on
Good Afternoon,
Occupancy date for Core and Shell
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Edgar Arevalo on
Regarding the MERV-8 filter section of this credit, which is for a C&S project, no tenant occupancy dates have been established. Should I just wait til we get the first tenant occupancy d
Option 1 Noncompliant Lights are Being Phased Out
EBOM-v4 SSc4:Light pollution reductionposted by Justin Schwartz on
Good afternoon everyone,