Forum quick links
IECC 2021
posted by Joshua Radoff on
Has anyone seen a comparison between IECC 2021 and previous versions of the energy code, including ASHRAE 2010?
Has the Composting credit been achieved with limited composting receptacles in the building?
Pilot-Credits SSpc129:Comprehensive Compostingposted by Kristen Fritsch on
The amount or spacing of receptacles are not necessarily spelled out, as w/ the recycle bins, and mainly the only place I am drawing from that it should be provided in all spaces is in the "Require
CO2 monitoring in return air ductwork in a behavioral health facility
Healthcare-v4 EQc1:Enhanced indoor air quality strategiesposted by Bethany Beers on
We are currently designing a behavioral health inpatient facility in the Seattle area. Per local codes, demand control ventilation is required and is allowed in the return air ductwork for spaces.
Entryway System
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Summer Gorder on
Does the 10'-0" entrway requirement only apply to the main entry or all entries to the building?
glare-control devices for C&S
CS-v4.1 EQc4:Daylightposted by Francesco Passerini on
Hello, the reference guide states: "Provide manual or automatic (with manual override) glare-control devices for all regularly occupied spaces".
How to document thermal comfort in incomplete spaces within the project
NC-v4 EQc5:Thermal comfortposted by reham gamal on
Dear All,
Category of cooling for process load
CS-v4.1 EAp2:Minimum Energy Performanceposted by Narguess Kh on
How should I categorize the cooling required for IT equipment in data halls.