Forum quick links
Skylight
NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
We have to model a retailbuilding in Climate zone 5.
LEED Zero
NC-v4 EAc5:Renewable energy productionposted by Vassil Vassilev on
Greetings,
Regarding Renewable Energy Production for LEED certification and also for LEED Zero certification, there is an issue which is kind of not clear to me.
Energy model as per ASHRAE 90.1-2013
Retail-NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
We art to prepare an energy model for a project, which should be in accordance with ASHRAE 90.1-2013.
G3.1.1 | Exception b (40 equivalent full-load hours per week)
CS-2009 EAp2:Minimum Energy Performanceposted by Danilo Ilic on
From what I could see in related posts, "40 equivalent full-load hours per week" are plainly interpreted as 40 working hours and without any connection to thermal load and I am not
Construction Work Area Depressurization
NC-v4 EQc3:Construction indoor air quality management planposted by Danilo Ilic on
Does anyone have an example of how construction work area depressurization (in order to create a pressure difference between construction and clean areas)&n
Prerequisite Required Documentation
NC-v4 EAp3:Building-level energy meteringposted by Danilo Ilic on
What constitutes "Confirmation of permanently instaled meters" in the required documentation part?
BUG method based on angle of mounting
NC-v4 SSc6:Light pollution reductionposted by sladjana pandurovic on
Does the angle of installation of the lamp influences its BUG rating?
Occupancy hours vs. Building Operating Plan
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Anna Korinkova on
My question is regarding to operating hours of the building and the Building Operating Plan (BOP).