Forum quick links
Option 2: New Building Institute Multifamily Guide under the LEEDv4.1 Residential Multifamily
NC-v4.1 EAc2:Optimize Energy Performanceposted by Anna Korinkova on
Hi,
Multispeed fan to operate at lowest setting when the space in unoccupied?
Retail-CI-v4 EAc2:Optimize energy performanceposted by shashank gangil on
We recently recied following review comment for one of the retail project based in taiwan. The project is using VRF System for cooling. The VRF comes with multispeed fan.
The BuildingGreen Team Needs Your Input: Planning remaining 2021 events
posted by RoseAnn Grimes on
Hello Everyone!
Can a building going for re-certification attempt additional credits that are not performance based
EBOM-v4.1 SSc3:Light Pollution Reductionposted by Frank Weiss on
I understand that a building attempting re-certification is awarded 10 points for their past certification. My question is can a building attempting re-certification using Version 4.1 also at
About LEED-ND Thesis
ND-v2009 NPDc2:Compact developmentposted by Mustafa Kucuk on
Hello to everyone. I am writing a thesis on LEED-ND and I need to give more information about LEED-ND. (How to get a certificate? What are the criteria and sub-titles?
On site visits required?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Kasandra Martin on
The project I am hired to commission is a day drive. Is it possible to only review the contractors tests or is on site necessary or required?
Indoor Water Use Reduction Calculator - Occupant Inputs for Core Restrooms in Office Building
posted by Karena Broman-Ballas on
I am working on the Water Reduction Credit for a project and confused on how to input the Occupant Percentages for central core restrooms. The instructions on the Water Reduction Calculator s
TABLE 6.8.2B Minimum Duct Insulation
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I want to verify TABLE 6.8.2B Minimum Duct Insulation considering the thermal resistance of a cylindrical wall, which is determined according to the logarithmic equation you can see
Industry wide EPD vs. Product Specific EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Caitlin Hutton on
Hello, I am attempting to achieve option one of the MRc2 credit meaning we need a total of 20 products from 5 different manufacturers.