Forum quick links
Campus with shared PV plant
NC-v4 EAc5:Renewable energy productionposted by Ricardo Sá on
Dear All,
We’re currently working on a LEED certification of a project with the following characteristics:
Energy Model Points clarification using ASHRAE 90.1.2013
NC-v4.1 EAp2:Minimum Energy Performanceposted by S S on
Chiller type for baseline building
CS-v4.1 EAp2:Minimum Energy Performanceposted by Narguess Kh on
I am working on a site in which due to the site limitations and building height restrictions wet solution is not feasible.
Energy Model Points for LEED v4.1 Datacenter Building
Data-Centers-NC-v4.1 EAp2:Minimum Energy Performanceposted by S S on
Greetings to All,
Hope all are safe.
We are doing the energy model for office building in which electrical energy only used.
Baseline System for a data center
CS-v4.1 EAp2:Minimum Energy Performanceposted by Narguess Kh on
I am working on a Data Center project which is located in Zone 4A. the project is assessed based on C&S. I am confused about the baseline building system selection.
Indoor plumbing fixtures and fittings, domestic hot water and dishwashers on the same supply line in tea kitchen
NC-v4.1 WEc4:Water Meteringposted by J Schütz on
Hello,
Energy Model - Alternative compliance for LEED V4.1 BD+C
NC-v4.1 EAc2:Optimize Energy Performanceposted by Amal Venugopal on
Hi All,
Job Opportunity: Entegrity is looking for two Building Certification experts to add to our team
posted by Meredith Hendricks on
Entegrity is advertising for two positions for Certification experts, one in Little Rock, AR and the other remote. If you know anyone looking for a change send them my way.
Design Submittal
posted by Aaron Kennedy on
We are finishing up the design submittal to submit for review, but I cannot find where the overall plans are supposed to be submitted? Am I missing it somewhere or Is there not a place to sub