Forum quick links
What's considered substantial completion if building is completed before the site?
NC-v4 SSp1:Construction activity pollution preventionposted by Adam Huckstep on
Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy.
Construction of site continuing after building completed
NC-v4 MRp2:Construction and demolition waste management planningposted by Adam Huckstep on
Hi All, I have a question on how to handle a project where construction will continue after the projects building is complete and ready for occupancy.
What exactly Accessible Flooring means herewith in this credit language?
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Jeevan Doifode on
For general office building which typically has flooring system with ceramic tiles and floorboxes for Data/voice.What exactly Accessible Flooring means herewith in this credit language?
Two New Climate Related resources
posted by Mary Ann Lazarus on
Hi Fellow SDLers: I'm writing to share intel about two recent climate change articles that provide links to some great new resources:
Calculator Question
NC-v4.1 EQc2:Low-Emitting Materialsposted by Catherine Blakemore on
Should joint compound and any related adhesives and sealants also be listed in the wall panels, insulation, ceilings categories - or are they only listed on paints/coatings and adhesives/sealants c
Active Monitoring System
Pilot-Credits EQpc124:Performance-based indoor air quality design and assessmentposted by Charlie Popeck on
Hi,
Indoor water use calculator
NC-v4 WEc2:Indoor water use reductionposted by Dina El-Sady on
Why the indoor water use calculator excel sheet is protected ?Any clue about the password?
Clarification on "Use label on map" for Diverse use Credit
CI-v4 LTc2:Surrounding density and diverse usesposted by Rowena Rawte on
Hi,
Can someone please clarify the excat meaning/requirement of "Use label on map" for Diverse Use Credit if possible with an example?
Tenant metering
CS-v4 EAc3:Advanced energy meteringposted by Patrice McVeigh on
Hi All, I am working on a core and shell office development under LEED V4, the criteria states that meters must be installed for future tenant spaces.