Forum quick links
DESIGN AND CONSTRUCTION PRELIMINARY REVIEW
CI-v4 EAc2:Optimize energy performanceposted by Zixuan Yuan on
Excuse me, in the supply airflow rate part, it is required that the airflow should be approximately 1 cfm/square feet for the office buildings.
What are Division 1 general requirements of the project specifications
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Ayman Raouf on
Can someone explain to me what are Division 1 general requirements of the project specifications?
Here are some extracts I can read:
electric vehicles and reduced parking footprint?
NC-v4.1 LTc8:Electric Vehiclesposted by Craig Flandermeyer on
Is there a way in v4.1 to use these two credits in tandem? V4 has some guidance that increases percentages if both are used. Curious if anyone has attempted both.
WELLv2 Movement V05.1 Site Planning and Selection - Pedestrian Friendly Streets
posted by Laura Charlier on
Under version 2 for V05, Part 1 refers to some vague requirements.
LEED V4.1 O+M: Interiors. Deciding LEED Boundary
posted by Maysoon Al-Khuraissat on
Question:
GFA exclusion
posted by sana salman on
are MEP spaces , like plant room, electrical room etc. included in the gross floor area
Bird Collision Deterrence – Performance Monitoring Plan
NC-v4 INc1:Innovationposted by Verde Design on
I am currently developing a performance monitoring plan for the Bird Collision Deterrence Pilot Credit and have a couple of questions:
New Year, New "Lighter Side of Green"! See last year's and share your talent this year in the Guru's Talent Show :)
posted by Barbra BatShalom on
Greetings Gurus!
No smoking sign within college campus
NC-v4 EQp2:Environmental tobacco smoke controlposted by Eric Carbonnier on
I am working on a LEED v4 NC project which is a department within a college campus.