Forum quick links
Site with no existing greenfield
CS-v4 SSc2:Site development - protect or restore habitatposted by Agustin Bertolotti on
Hi everyone
We are working on a site which is previously developed with no existing greenfield or natural area.
Option 2 Natural land cover - rainfall percentile to use
NC-v4.1 SSc4:Rainwater Managementposted by Agustin Bertolotti on
Hi all
90.1 Section 8.4.2 Automatic Receptacle Control for 220 volts systems
CI-v4 EAp2:Minimum energy performanceposted by Agustin Bertolotti on
Hi Everyone
We have a Project in a location where the electric supply is in 220 volts.
Natural ventilation room by room calculation
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Agustin Bertolotti on
Hi everyone
LEED Homes Certification in Uruguay
posted by JUAN FELIPE BARBOT GIORDANO on
Hi there,
WEp1 calculator
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Muriel Alvarez on
Dear Since I have a problem with BETA version for WEp1, the form did not calculated the percentage correctly, I´ve decided to use the v06 form calculator, well...
Non potable water reservoir - WEc1 -NC 2009
NC-2009 WEc1:Water Efficient Landscapingposted by Muriel Alvarez on
We are certifying a project NC 2009 and we are counting in our credit with a non potable reservoir outside the LEED Boundary but is within the limits of the property.
Sediment Basin dimensioning
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Hi, this may be a silly question. When dimensioning a temporary sediment basin, the CGP says to use either the calculations for the 24 hs- 2 year desing storm or 3600 cubic feet x acre drained.
Semi-permanent streams
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Paula Hernandez on
Our project has a very small semi-permanent stream runing through it (i.e., the streams forms only in heavy rainfalls). .