Forum quick links
Missing parameters in water analysis - urgent query
NC-v4 WEc3:Cooling tower water useposted by Nermin Hegazy on
Hello all!
Solar panels outside LEED boundary
CS-v4 EAc5:Renewable energy productionposted by Jefferson Au-Yeung on
Hi
Restrictions for using O+M?
posted by Jefferson Au-Yeung on
Hi everybody,
Concrete
NC-2009 MRc5:Regional Materialsposted by Steve Willey on
Is there anyway to calculate for cost per pound for cement, fly ash, limestone and sand
Greenhouse gas emissions factors - following guidance from ACP EApc95
NC-v4 EAc7:Green power and carbon offsetsposted by Shannon Oletic on
Hello,
MR credids
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
My project is using a pre-fabicated panel (walls and ceilings) inclusive of doors, windows and ceiling grid lights. All of these components are part of the panel design.
Ecological landscape/site/civil consultant
posted by Rand Ekman on
Hi All ... I'm seeking suggestions for an ecologically minded landscape/site/civil consultant. Ideally with strong knowledge about Florida ecosystems. Thanks much for any sharing.
WFH & Family Leave Policies Share
posted by Sarah Gudeman on
In the wake of pandemic WFH requirements, we are looking to revamp employee policies and I thought this type of information share would be something we Green Gurus would love to thought-share on.&n
ONSITE RENEWABLE ENERGY FOR PREREQUISITE
NC-v4.1 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Is it possible to meet the Prerequisite and Credit with onsite renewable energy under V4.1 ?