Forum quick links
3. Lighting Control
CI-v4.1 EQc6:Interior Lightingposted by Agata Mozer on
Hi All, I have a question regarding strategy 3. Lighting control.
Option 1. No Off-Street Parking
CI-v4.1 LTc5:Reduced Parking Footprintposted by Waleed AlGhamdi on
Hello,
Autopsy Spaces
NC-v4 EAp2:Minimum energy performanceposted by Cory Duggin on
Would autopsy and associated support spaces be considered a lab space to be included on systems under G3.1.1 exception c requiring turn down at night? I ask because these same spaces in a hos
Concrete
NC-2009 MRc5:Regional Materialsposted by Steve Willey on
Is there such a thing as a Regional Material Calculation for concrete.
Performance Targets on Policies
EBOM-v4.1 MRp1:Purchasing Policyposted by Sofia Barahona on
We are currently working on the LEED O+M v4.1 certification of a project, and we have some doubts regarding some prerrequisites that requires the development of policies.
Recertification
posted by Alice Andersen on
I would like to know if my project is required to do a Recertification? It is certificed LEED Gold O+M v.
ASHRAE 62.1 2010. Section 6.2.1.2 PM2.5
NC-v4 EQp1:Minimum indoor air quality performanceposted by Eric Dyer on
Hello
We are working on the LEED project in Korea.
I have a question about ASHRAE 62.1 2010.
Location & transportation
Pilot-Credits INpc113:Informing Design Using Triple Bottom Line Analysisposted by Jill Kurtz on
With Scope 3 being such a big part of our carbon emissions, why aren't more categories included in teh location and transportation section?
Imperil and Metric units?
NC-v4.1 MRc4:Material Ingredientsposted by Kristi Merdler on
I have a project in Canada (metric units) but the client wants all documents in Imperial units. Is this a problem for LEED during the review process?
DOASs provide outdoor air to more than one tenant
CI-v4 EAc3:Advanced energy meteringposted by CT G on
We're working on a project where the tenant occupies 2 floors in a 4 story-building. This building has DOAS units that supply OA to all 4 floors.