EBOM-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by Kevin Mowatt on
If a building was certified in January 2019 under v3, when is recertification required?
How to identify regularly occupied spaces in a mall building?
CS-v4.1 EQc4:Daylightposted by Julio Fernandez Amodia on
Hi,
I am pursuing this credit for a mall building, and I wonder what the right way to identify the regularly occupied spaces is.
Letter
CI-v4.1 IPc1:Integrative Processposted by Aleksandra Suchomska on
Hi,
my team is doing the integrative process letter for the first time. How long should it be? How detailed should be the description of each analyzed area?
Dishwasher requirements
CI-v4.1 WEp1:Indoor Water Use Reductionposted by Aleksandra Suchomska on
Hi,
eQUEST DOE2.3 for LEED V4 EAp2 and EAc1
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello Everyone,
Looking for low carbon concrete case studies
posted by Bryna Dunn on
I am looking for case studies/trying to identify buildings using concrete mixes with upwards of 30% replacement of cement by SCMs. I've been in conversations with some structural enginee
EQc4 - IAQ Assessment, Option 1. Flush-Out, Path 1. Before Occupancy
NC-v4 EQc4:Indoor air quality assessmentposted by Theresa Lehman on
If the humidity exceeds the range (higher than 60%) for a couple of hours, can the team simply add those few hours onto the flush-out, or does the flush-out have to start completely over at the tim
Green area reserved for future building development
NC-v4.1 SSc2:Protect or Restore Habitatposted by Michael on
My project has 2 phases of development. Currently, we only apply LEED for phase 1. There is a big greenery area, reserved for future building in phase 2.
LCA for LEED: Impact categories in Tally vs EPDs
posted by Kristian Kicinski on
We are trying to figure out how we are going to meet the LEED Credit for Building Life Cycle Impact Reduction for the first time.
Interior Project Water Performance
EBOM-v4.1 WEc1:Water Performanceposted by yingling guan on
For interior project, if there is only one pantry faucet within the project scope. And occupants of this project will use other indoor water fixtures or fittings installed out of the thi