Forum quick links
Shopping mall is LEED BD+C CS or Retail
posted by Michael Wahjudi on
HI all, we have shopping mall development. Is the shopping mall fall under LEED BD+C Core and Shell OR retail under v4.1?
we're hiring - would appreciate your help making a connection!
posted by Julia Siple on
Hi! Quinn Evans is looking for a great candidate for a new position that focuses on design performance analysis.
Submitting for additional Design Credits at Construction Credit Review Stage
posted by Philippa Cameron on
Hi. We are preparing to register a project and submit documentation for the design credits following a split review approach.
How to scrutiny the local testing agency's report for LEED Low emitting materials?
Retail-CI-v4.1 EQc2:Low Emitting Materialsposted by Sagar Siripuram on
Hello, I've been having this doubt for many days, Just wanted clarity on this query.
Nonroof measures for roof terrace
NC-v4.1 SSc5:Heat Island Reductionposted by Reshadee Weerasooriya on
Hi all,
Compliant EPR Programs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Tullos on
Has anyone had luck getting credit for a take back service program like Steelcase's (https://www.steelcase.com/services/#recycle
building on campus with no smoking policy
CI-v4 EQp2:Environmental tobacco smoke controlposted by Megan Valentine on
We are renovating a building on a campus. The campus has a no smoking policy with signage stating the policy at all entrances to the campus.
Campus approach: can we install water meter for the entire landscape, sanitaryware as a whole
NC-v4 WEc4:Water meteringposted by Michael on
My project is a campus project, consisting of 4 individual buildings. To fulfill this credit, can I install 1 meter to monitor sanitaryware for 4 buildings together as a whole?
PV Solar Panels outside LEED Boundary
NC-2009 EAc2:On-Site Renewable Energyposted by Ammar Yahia on
A New Construction Project in which the PV panels to be installed on a "330,000 SQM roof of an airport terminal building project" to offset 22% of annual energy cost.
BPDO Material Ingredients: required to report material cost if pursuing Option 1?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Adam Weiss on
Hello, if we are pursuing option 1 for MRc5 (20 compliant products from at least 5 manufacturers), are we required to report the cost of each material?