Change of space during performance period
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Pulak Goyal on
I have a building going for LEED O+M v4.1 Existing Buildings Certification.
(mis)Understanding the LEED Review (and appeal) process
posted by Susannah Goddard on
We have recently undergone the Final Design Stage Review and have some credits 'denied'.
Bird glazing that meets quality views credit requirements
NC-v4 EQc8:Quality viewsposted by Blake Weaver on
I have an owner that is interested in installing bird glazing for their Airport project. We are pursuing the quality view credit which somewhat limits our options for bird safe glazing.
Baseline HVAC, Non-regulated loads and Exceptional Calculation Method for V4.1
NC-v4.1 EAp2:Minimum Energy Performanceposted by on
A 156,000 SF pharmaceutical production facility wants to pursue LEED v4.1. Building breakdown as follows:
Meeting the credit intent
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Jon Hall on
The credit intent states the following: Encourage any and all members of the project team to promote and further social equity by integrating strategies that address identified social and economic
Project phases vs LEED certification approach?
posted by Ehsan Baharvand on
Dear all, I'm wondering what certification approach I can propose for a poduction site consisting of 3 construction phases (like building extensions over different period of time): phase 1 was bui
Federal (DoD) Guiding Principles Assessment expertise needed
posted by emily reese moody on
Hey all,
Energy Metering Displays
NC-v4 EAc3:Advanced energy meteringposted by Allison Para on
Hello Pros,
I am working on a student residential building (NC) that will have advanced submetering for the 5 floors.
Existing Parking Lot
NC-v4.1 MPR2:Must use reasonable LEED boundariesposted by Laura Soma on
If building next to an existing parking lot, which will serve the new structure, does the parking lot footprint need to be included in the LEED project boundaries? Assume there will be minor
Retail FTE Access
CS-v4 LTc6:Bicycle facilitiesposted by Michelle Rosenberger on
This core and shell office building has retail on the ground level. There are locker rooms and bike storage on this level but no direct interior access from the retail spaces to these facilities.