CS-v4 EAp2:Minimum energy performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .
Modeling UPS Room for Data Center
NC-2009 EAp2:Minimum Energy Performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .
UPS rooms for LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Rajat Wadhwa on
Hi, I am working on a Data Center and I am confused if we should model UPS rooms for LEED and what schedule should I use since its a backup supply room incase the power goes .
No Cooling Tower
NC-v4.1 WEc3:Optimize Process Water Useposted by Azra on
Hello,
we are working on numerous projects which do not include a cooling tower nor evaporative condensers.
Optimize Process Water Use, Option 2 with ASHRAE 90.1 2010 model?
NC-v4.1 WEc3:Optimize Process Water Useposted by Deb Favaretto on
We are submitting a LEED v4 BD+C NC project with LEED v4.1 upgrades on a credit-by-credit basis. Minimum and Optimize Energy Performance have remained v4.
Multilevel lighting control
NC-v4.1 EQc6:Interior Lightingposted by Michael on
I have 10 lighting fixtures in an office space, and the architect is providing 3 on-off switches:
- switch 1, on-off 5 lightings (50% of lighting numbers)
Gulf Coast Green call for proposals
posted by Catherine Callaway on
I invite you to submit a speaker proposal for Gulf Coast Green and plan to join us at the Houston Zoo on March 22, 2024. It's always an inspiring event!
Understanding Pilot-Credits IPpc101
Pilot-Credits IPpc101:Integrative Processposted by Fatimah Razak on
Dear forum members,