Log in
Forum
Loading...
Topic

Inclusive Design Pilot Credit

Pilot-Credits INpc125: Inclusive Design
posted by Karen Mahrous on Jun 20, 2019, 4:16 pm

Pilot Credit Registration Required Post: Our project chose to pursue this credit because creating a safe, inclusive space for all employees and visitors was very important to the project owners....

Last reply: Karen Mahrous, Oct 28, 2019, 3:59 pm

Reduced Parking Footprint Opt 4- Unbundling Parking

NC-v4.1 LTc7: Reduced parking footprint
posted by Rebecca Mann on Oct 27, 2019, 10:46 am

New options were introduced in v4.1 for LT Reduced Parking Footprint. Parking provided for our project slightly exceeds the bylaw requirement with 9 stalls required, and 10 provided including 1...

how do you manage providers that provide the right materials for LEED?

Pilot-Credits SSpc55: Bird collision deterrence
posted by kim sung on Oct 27, 2019, 10:29 am

Hello.

There is a question as a preliminary contractor for bird collision deterrence.

If I had a way to lower a threat factor to 15 or less as an alternative to bird collision,...

Biophilia and Renovations

Pilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environment
posted by Vanessa Hostick on Oct 25, 2019, 1:02 pm

Are there any metrics available based on case studies for the pilot credit or related WELL criteria that venues or spaces which renovate using the biophilia concepts rent quicker or have a...

browser compatibility

Navigating LEED Online
posted by emily reese moody on Mar 22, 2017, 7:43 pm

vs. Reader -  https://forums.adobe.com/thread/1866645- you might check it out. On another note, due to changing circumstances in my personal and professional life, I am no longer the LEEDuser Expert for this forum. While I'm not going away, I'm also not going to be keeping up with this forum on a regular basis. But I WILL report back if I hear from the Technology team. Log in or register to post...

Last reply: Tiffany Beffel, Oct 27, 2019, 7:18 pm

Withdrawal of Appeal?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by shashank gangil on Oct 20, 2019, 11:14 pm

Hi

I need this information urgently. We recently got 83 points for a project after final construction review and 1 point was pending. This pending point is actually Regional priority point...

Last reply: Tiffany Beffel, Oct 27, 2019, 7:11 pm

Biophilic Design: Quantifiable Metrics

Pilot-Credits EQpc123: Designing with Nature, Biophilic Design for the Indoor Environment
posted by LEED Team DC on Jan 30, 2019, 10:57 am

Hi, I'm wondering if there are shareable examples of a project team documenting quantifiable biophilic metrics.

I'm inclined to think these metrics could be gained either noting dimensions...

Last reply: Vanessa Hostick, Oct 25, 2019, 1:08 pm

Emissions Documentation

NC-v4.1 EQc2: Low-emitting materials
posted by alix fox on Oct 24, 2019, 5:59 pm

There are several materials in my calculator for which I have...

Last reply: Scott Laughlin, Oct 25, 2019, 10:25 am

Dense cities & Municipality infra structure

NC-v4 SSc4: Rainwater management
posted by soha yamani on Mar 24, 2019, 2:26 am

We have a case were our site lies within a densely urban city , where they have minimal events of rainfall but with huge amounts- therefore allover the city they collect the rain water through...

Last reply: Yasha Ogg, Oct 25, 2019, 9:25 am

No Cooling Tower pilot credit

Pilot-Credits WEpc94: No Cooling Tower
posted by Gail Napell on Oct 30, 2018, 12:59 am

Hi all

we're pursuing this credit and received a comment from the LEED reviewer that we need to submit the survey confirmation e-mail in order to achieve the credit.  The survey asks if we...

Last reply: Sushrut Jadhav, Oct 25, 2019, 1:08 am