Entryway mats required for a dorm that has apartments on the first floor?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Sue Bryant on Mar 14, 2018, 4:29 pm

We have a dorm project that has 4 apartments on the first floor for hall directors. These have their own private exterior entry. There is no further guidance for residential projects. We have...

Last reply: Paula Melton, Mar 22, 2018, 2:59 pm

Permanent entrywway systems- rollout mats?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Keith Robertson on Sep 10, 2017, 9:24 am

The reference guide includes rollout mats in the list of "acceptable permanent entryway systems." LEED 2009 allowed rollout mats to be used as part of the 10' but treated it as non-permanent....

Last reply: Trista Brown, Mar 5, 2018, 1:15 pm

LEED Addition- use Entryway from Adjoining building?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Joyce Kelly on Feb 27, 2018, 5:43 pm

A two story LEED addition will be regularly accessed from a new stair/elevator tower as well as a corridor at each level that connects it to the existing building. A permanent entryway system is...

Last reply: Joyce Kelly, Mar 2, 2018, 9:43 am

NC-v4 EQc1- Enhanced indoor air quality strategies

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by SAJJAD MALIK on Dec 15, 2017, 1:40 am

Dear All,

Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.

please reply me as soon...

Last reply: Ben Stanley, Jan 15, 2018, 4:53 pm

enhance indoor air quality strategies

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by SAJJAD MALIK on Dec 14, 2017, 7:02 am

Dear All,

Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.

please reply me...

Last reply: Ben Stanley, Jan 15, 2018, 3:51 pm

Interior Cross Contamination Prevention

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Ricardo Sá on Sep 29, 2017, 6:39 am

LEED EQ Credit Enhanced Indoor Air Quality Strategies requires, for mechanical ventilated spaces (OPTION 1), interior cross contamination prevention, i.e., to “sufficiently...

Last reply: Melissa Kelly, Oct 5, 2017, 10:54 am

Can sanitation maintenance garage apply as a warehouse?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Edgar Arevalo on Feb 10, 2017, 3:13 pm

I ask because according to the LEED v4 reference guide, garage spaces in warehouses and distribution centers are no required to install permanent entryway systems at the doors from the exterior...

Last reply: Pournamasi Rath, Sep 26, 2017, 3:48 pm

Door arrest systems or free-swinging closers allowed?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Florian Schmidtchen on Aug 29, 2017, 6:17 am

Is it allowed to install additional door arrest systems or free-swinging closers to the self-closing doors, so that in case the occupant is able to keep the door open for a short period? This...

Last reply: Tristan Roberts, Aug 30, 2017, 10:48 am

Elevator lobbies-with airlocks?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Florian Schmidtchen on Aug 9, 2017, 11:44 am

Dear all,

We have mechanically ventilated spaces. For the option 1 we therefore have to comply with the requirement B. interior cross-contamination prevention. To create negative pressure...

Additional Enhanced IAQ Strategies

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Marina Curto on Jul 12, 2017, 9:41 am

In this credit, two options are available, Options 1 and 2. Can a project achieve Option 2 only without pursuing Option 1?

Last reply: Trista Brown, Jul 20, 2017, 6:33 pm